Projects

WORKS IN HAND OF SK EMDADUL HAQUE Al MAMUN 2023

Sl Name of Work Date of
Award
Contract
Value (Tk)
Share(%) of Sk Emdadul Haque Al Mamun Contract value
of SEHA
Name & Address of Procuring Entity
1 Construction of Guide Bundh from M-144.00 to M-550.00 406.00m and D/S End Termination 94.00m Total Guide Bundh Length 500.00m Along the Left Bank of Dudhkumar River in connection with Sonahat Bridge Construction Project on the Road of Bhurungamari-Sonahat land Port-Madargonj-Vitorbond-Nageswari Z-5624 across the Dudhkumar River at Sonahat in Upzilla-Bhurungamari Dist.-Kurigram under Kurigram O&M Division BWDB Kurigram during 2019-2020 & 2020-2021,TID: 355237,Package No. W-01/2019-2020 24.12.2019 273,619,763.42 49.00% 134,073,684.08 Executive Engineer, Kurigram O&M Division,BWDB, Kurigram
2 Bank Revetment Work on Left Bank Brahmaputra River from KM 15.000 to KM 15.500 500.000m at Baladmara Area in Union-Bondober Upazila-Rowmari District-Kurigram during 2019-2020 & 2020-2021.TID  427714,Package No. KURI/ADP/ROWMARI/P-16 20.07.2020 307,753,402.93 49.00% 150,799,167.44 Executive Engineer, Kurigram O&M Division,BWDB, Kurigram
3 Kuri/ADP/Chilmari-03/17
Bank revetment work on the right bank of Brahmaputra river from km 53.450 to km 53.700 = 250 m in Upazila-Ulipur, District- Kurigram.TID 658741
15.05.2022 169,148,979.37 80.00% 135,319,183.50 Executive Engineer, Kurigram O&M Division,BWDB, Kurigram
4 RIVERBANK PROTECTIVE WORK ALONG THE RIGHT BANK OF DUDHKUMAR RIVER FROM KM 0.000 TO KM 0.500 = 500 METER AND U/S END TERMINATION IN UNION. NOLEA , UPAZILA- BHURUNGAMARI, DIST- KURIGRAM.TID 648743,Package No.  Kuri/Dudhkumar/W-11 17.04.2022 115,310,344.47 80.00% 92,248,275.57 Executive Engineer, Kurigram O&M Division,BWDB, Kurigram
5 RIVERBANK PROTECTIVE WORK ALONG THE RIGHT BANK OF DUDHKUMAR RIVER FROM KM 0.500 TO KM 1.000 = 500 METER AND D/S END TERMINATION IN UNION. NOLEA , UPAZILA- BHURUNGAMARI, DIST- KURIGRAM. TID  648744, Package No.  Kuri/Dudhkumar/W-12 17.04.2022 105,123,592.61 80.00% 84,098,874.09 Executive Engineer, Kurigram O&M Division,BWDB, Kurigram
6 Repair/Rehabilitation of Dharla River Left Bank from Km.33.100 to Km. 37.100 4000.00 metre flood control Embankment at Pateshwari UP. Vogdanga UZ. Kurigram Sadar Dist. Kurigram under Kurigram O&M Division BWDB Kurigram. During the year 2020-2021,TID :545632,Package No. Kuri/ADP/Dharla-46 29.04.2021 61,017,715.42 100.00% 61,017,715.42 Executive Engineer, Kurigram O&M Division,BWDB, Kurigram
7 River Bank Protective work along right bank of Flood Control Embankment of Dharla River from Km 40.100 to km 40.700 600.00m at Mogalbasa Bazar area in UP Mogalbasa Upazilla Kurigram Sadar Dist Kurigram during 2020-2021,TID: 516442,package No. Kuri/ ADP/Dharla-14 27.02.2021 131,307,698.99 100.00% 131,307,698.99 Executive Engineer, Kurigram O&M Division,BWDB, Kurigram
8 River Bank Protective work along right bank of Flood Control Embankment of Dharla River from Km 40.700 to km 41.400= 700.00m at Mogalbasa Bazar area in UP Mogalbasa Upazilla Kurigram Sadar Dist Kurigram during 2020-2021,TID: 516443,Package No. Kuri/ ADP/Dharla-30 27.02.2021 151,043,795.94 100.00% 151,043,795.94 Executive Engineer, Kurigram O&M Division,BWDB, Kurigram
9 River Bank Protection Work on the left bank of Brahmaputra river from km 39.500 to km 39.700=200m at mohongong bazer area, upazilla -Rajibpur, District-Kurigram,TID: 570027,Package No. Kuri/ADP/Rajibpur /21 10.07.2021 58,490,085.40 100.00% 58,490,085.40 Executive Engineer, Kurigram O&M Division,BWDB, Kurigram
10 River Bank Protective Work with U/S End Termination along the Left Bank of Flood Control Embankment of Dharla River from KM 10.500 to KM 11.000 500m at Sonaikazi area at Shimulbari Union in upazila Fulbari District Kurigram during 2020-2021,TID: 486032,Package No. Kuri/ADP/Dharla-05 13.12.2020 116,751,668.40 100.00% 116,751,668.40 Executive Engineer, Kurigram O&M Division,BWDB, Kurigram
11 Construction of Office Building cum Rest-house under Kurigram O&M Division,BWDB,TID: 537770,Package No. Kuri/ADP/Office-49 01.04.2021 53,186,325.84 49.00% 26,061,299.66 Executive Engineer, Kurigram O&M Division,BWDB, Kurigram
12 RIVERBANK PROTECTIVE WORK ALONG THE LEFT BANK OF DUDHKUMAR RIVER FROM KM 0.000 TO KM 0.300=300.00 M AND U/S END TERMINATION AT NORTH DHALDANGA AREAS, UPAZILA- BHURUNGAMARI, DIST- KURIGRAM. TID 718826,Package No.  Kuri/Dudhkumar/W-01 26.08.2022 86,452,780.00 10.00% 8,645,278.00 Executive Engineer, Kurigram O&M Division,BWDB, Kurigram
13 RIVERBANK PROTECTIVE WORK ALONG THE LEFT BANK OF DUDHKUMAR RIVER FROM KM 0.300 TO KM 0.800=500.00 M AT NORTH DHALDANGA AREAS, UPAZILA- BHURUNGAMARI, DIST- KURIGRAM. TID 717421,Package No.  Kuri/Dudhkumar/W-02 08.08.2022 112,807,900.00 80.00% 90,246,320.00 Executive Engineer, Kurigram O&M Division,BWDB, Kurigram
14 RIVERBANK PROTECTIVE WORK ALONG THE LEFT BANK OF DUDHKUMAR RIVER FROM KM 0.800 TO KM 1.300= 500.00 M AT NORTH DHALDANGA AREAS, UPAZILA- BHURUNGAMARI, DIST- KURIGRAM.TID 718827,Package No.  Kuri/Dudhkumar/W-03 26.08.2022 112,208,920.00 80.00% 89,767,136.00 Executive Engineer, Kurigram O&M Division,BWDB, Kurigram
15 Construction of 01 (One) no Combined Water Control Structure (Regulator cum Weir cum Bridge) over Akhira River at nearest D/S of Shorifer para Bridge in Pirgonj upazila district Rangpur.TID 786386,Package No. Regulator/ Akhi-21 23.03.2023 155,911,408.06 75.00% 116,933,556.05 Executive Engineer, Rangpur  O&M Division,BWDB,
16 Construction of 01 (One) no Combined Water Control Structure (Regulator cum Weir cum Bridge) on Akhira River at nearest D/S of Kalitola Bridge in Pirgonj upazila district Rangpur.TID  786387,Package No.  Regulator/ Akhi-22 23.03.2023 154,094,370.50 75.00% 115,570,777.88 Executive Engineer, Rangpur  O&M Division,BWDB,
17 River Bank Protection work along the Right bank of Akhira river from Km. 1.000 to Km. 2.000 = 1000.00 m at Kofil Sarker Bridge in UZ. Pirgonj, Dist. Rangpur under Rangpur O&M Division, BWDB, Rangpur.TID 704916,Package No.  Protective/ Akhi-19 14.07.2022 63,345,660.46 49.00% 31,039,373.63 Executive Engineer, Rangpur  O&M Division,BWDB,
18 River Bank Protection work along the Left bank of Akhira river from Km. 0.000 to Km. 1.000 = 1000.00 m at Kofil Sarker Bridge in UZ. Pirgonj, Dist. Rangpur under Rangpur O&M Division, BWDB, Rangpur.TID 696095,Package No. Protective/ Akhi-15 14.07.2022 59,446,253.55 100.00% 59,446,253.55 Executive Engineer, Rangpur  O&M Division,BWDB,
19 Construction of 280m long PSC Girder Bridge over Boral river at Ch.15100m on Ershadnagar Hat-Demra UP office road under Faridpur Upazila,District-Pabna [Road ID: 176333008],TID: 486327,Package No. CIB-Pab-W-69 19.07.2020 267,477,235.56 49.00% 131,063,845.42 Executive Engineer, Pabna O&M Division,BWDB, Pabna,Email:xen.pabna@lged.gov.bd,Phone: 0731-66133
20 Bank revetment work along the left bank of Teesta River at Dahagram-Angorpota area in between km. 2.676 to km. 4.406 ( working length Km. 3.496 to 4.406 = 910.00m) in c/w Border River Bank Protection project in UZ. Patgram, Dist. Lalmonirhat under Lalmonirhat O&M Division, BWDB, Lalmonirhat. (JRC N0. 15/2016-17).( Package No. BR-Lal-09) (Remaining part). TID 639213,Package No.  BR-Lal-09 28.08.2022 146,663,906.77 51.00% 74,798,592.45 Executive Engineer, Lalmonirhat O&M Division,BWDB
21 Bank revetment work along the left bank of Teesta River at Dahagram-Angorpota area in between km. 4.406 to km.5.231 = 825.00m in c/w Border River Bank Protection project in UZ. Patgram, Dist. Lalmonirhat under Lalmonirhat O&M Division, BWDB, Lalmonirhat. (JRC N0. 66/2015-16). (Package No. BR-Lal-10) (Remaining part).TID 639215,Packaqge No. BR-Lal-10 28.08.2022 119,286,185.71 51.00% 60,835,954.71 Executive Engineer, Lalmonirhat O&M Division,BWDB
22 Bank revetment work along the L/B of Teesta River at Dahagram-Angorpota area from Km. 2.586 to Km. 3.496 = 910.00m in Upazila. Patgram, District. Lalmonirhat in c/w Border Rivers Bank Protection & Development project (Phase-2) under Lalmonirhat O&M Division, BWDB, Lalmonirhat. (JRC N0. 43/2015-16). (Package No. BR-Lal-06) (Remaining Part).TID 714171,Package No.  BR-Lal-06 26.12.2022 143,549,985.23 80.00% 114,839,988.18 Executive Engineer, Lalmonirhat O&M Division,BWDB
23 Underwater riverbank protection with geotextile bags Extension at Harirampur- 4.00 km in C/W Flood and River bank erosion risk management Investment program (Project-2). TID 713629,Package No. W-05/2021-2022 25.06.2023 252,646,022.60 49.00% 123,796,551.07 Executive Engineer, Manikganj O&M Division,BWDB,
24 Maintenance works ( cambering,ghogs -raincut-slope repair,ditch filling,ramp construction etc. ) for 21.30 km tranche-1 embankment ( 3 km in different locations) Under Construction division (FRERMIP), BWDB, Koitala, Bera, Pabna. During The FY-2022-23. TID 794639,Package No.  W-11/2021-2022 15.05.2023 69,915,716.82 49.00% 34,258,701.24 Construction Division, FRERMIP, BWDB, Koitala, Bera, Pabna
25 Shajadpur embankment construction from chainage km 21.300 to km 23.830 = 2.530 km under Construction Division, FRERMIP , BWDB, Koitala, Bera, Pabna .TID 891398,Package No.  W-10-a/2021-2022 11.12.2023 96,710,407.26 75.00% 72,532,805.44 Construction Division, FRERMIP, BWDB, Koitala, Bera, Pabna
26 River Bank Protection Work along the Right Bank of the Kirtinasha river From Km 12.450 to Km 12.950 = 0.500 Km in Sadar Upazila of Shariatpur District, Under Shariatpur O&M Division, BWDB, Shariatpur during the year 2021-2022.TID 654845 Package No. Kirtinasha/RBP-09 18.04.2022 115,660,344.30 80.00% 92,528,275.44 Executive Engineer,Shariatpur O&M Division,BWDB
27 River Bank Protection along the Left Bank of Kirtinasha River From Km 15.550 to Km 16.120 = 0.570 Km & D/S End Termination at Left Bank of Kirtinasha River(at Km 16.120) = 15.710 m Total Length = 585.710 m in Sadar Upazila of Shariatpur District, Under Shariatpur O&M Division, BWDB, Shariatpur during the year 2021-2022.TID 649820 Package No.  Kirtinasha/LBP-17 25.04.2022 142,371,707.29 80.00% 113,897,365.84 Executive Engineer,Shariatpur O&M Division,BWDB
28 River Bank Protection along the Left Bank of the Kirtinasha river From Km 9.700 to Km 10.100 = 400 .00m & From Km 10.200 to Km 10.275= 75.00 m and U/S End Termination(at Km 9.700) = 62.83m ;Total length = 537.83 m in Sadar Upazila of Shariatpur District, Under Shariatpur O&M Division, BWDB, Shariatpur during the year 2021-2022. TID 658856,Package No. Kirtinasha/LBP-06 18.04.2022 124,012,691.14 100.00% 124,012,691.14 Executive Engineer, Shariatpur O&M Division,BWDB
29 River Bank Protection along the Left Bank of the Kirtinasha From Km 14.100 to Km 15.000 = 0.900 Km in Sadar Upazila of Shariatpur District under Shariatpur O&M Division, BWDB, Shariatpur during the year 2021-2022.  Kirtinasha/LBP-12 TID 720690 21.09.2022 240,889,460.97 80.00% 192,711,568.77 Executive Engineer, Shariatpur O&M Division,BWDB
30 Kirtinasha/LBP-18
River Bank Protection along the Left Bank of the Kirtinasha From Km 21.500to Km 22.300 = 0.800 Km & D/S End Termination at Left Bank of the Kirtinasha River(at Km 22.300) = 15.71m ;Total length = 815.71m in Sadar Upazila of Shariatpur District, Under Shariatpur O&M Division, BWDB, Shariatpur during the year 2021-2022.TID 720692
27.10.2022 262,372,008.06 80.00% 209,897,606.45 Executive Engineer, Shariatpur O&M Division,BWDB
31 Bank protection work along the right bank of the river Jamuna from Km. 54.170 to Km.54.610 equal to 440.00m at Kamarjani in Upazila Gaibabdha Sadar Dist. Gaibandha in connection with the project Protection of Goghat and adjacent area including Khanabari from the right bank erosion of the Jamuna River at Gaibandha Sadar & Sundarganj Upazila in Gaibandha District under Gaibandha O&M Division BWDB Gaibandha during the Year 2020-2021 & 2021-2022.TID 508039,Package No. Kamarjani-07/ 2020-2021 21.12.2020 258,065,617.16 49.00% 126,452,152.41 Executive Engineer, Gaibandha O&M Division,BWDB
32 Bank Revetment work along the right bank at sandrabaz from km 21.550 to 21.850= 300m, hazipur 23.500 to 23.850= 350m & kashipur 25.200 to 25.500= 300m. in C/W Protection Project at Moulvibazar Sadar Rajnagor & Kulaura Upazilla from erosion of Manu river under Moulvibazar O & M Division BWDB Moulvibazar during the FY 2020-21 , 2021-22 & 2022-2023.TID 592771,Package No. MR-PW-47 30.09.2021 201,308,443.81 49.00% 98,641,137.47 Executive Engineer, Moulvibazar O&M Division,BWDB
33 Revetment work on the right bank of Jamuna river from meterage 1200.00 to meterage 1500.00 300 meter at Singrabari area of Kazipur Upazila in Sirajganj District under Sirajganj O&M Division BWDB Sirajganj. TID 536825 27.04.2021 216,748,815.48 49.00% 106,206,919.58 Executive Engineer,Sirajganj O&M Division,BWDB
34 BPW-Paker-04/20-21
River bank protection work along the left bank of Jamuna river from km.0.900 to km.1.200 = 0.300km at Jamthal in upazila-Sariakandi of Bogra district in connection with â??Protection erosion of Jamuna river at Pakerdaha & Balijuri of Madarganj Upazila of Jamalpur district and at Jamthal of Sariakandi Upazila of Bogra district under Jamalpur O&M division during the year 2021-2022 & 2022-2023. TID 644998
19.04.2022 244,949,593.54 80.00% 195,959,674.83 Executive Engineer,Jamalpur O&M Division,BWDB
35 River bank protective work along the left bank of Meghna river from km 148.187 to km 148.537 = 350 m in c/w “Protection work at the bank of Meghna river at Borokheri, Ludhua bazar and Kader ponditer hat areas in Ramgati and Kamal Nagar upazila under Lakshmipur District” Project in Upazila-Kamalnagar, Dist.-Lakshmipur under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2021-2022 (Package No.- Lak/W-23/Lot-1/2021-2022) TID 599191,Package No. Lak/W-23/Lot-01/2021-2022 09.02.2022 318,548,415.18 49.00% 156,088,723.44 Executive Engineer, Laksmipur O&M Division,BWDB,
36 River bank protective work along the left bank of Meghna river from km 155.500 to km 155.800 = 300 m in c/w “Protection work at the bank of Meghna river at Borokheri, Ludhua bazar and Kader ponditer hat areas in Ramgati and Kamal Nagar upazila under Lakshmipur District” Project in Upazila-Kamalnagar, Dist.-Lakshmipur under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2021-2022 (Package No.- Lak/W-29/Lot-3/2021-2022) TID 668357,Package No. Lak/W-29/Lot-03/2021-2022 11.10.2022 285,055,552.03 80.00% 228,044,441.62 Executive Engineer, Laksmipur O&M Division,BWDB,
37 River bank protective work along the left bank of Meghna river from km 155.200 to km 155.500 = 300 m in c/w “Protection work at the bank of Meghna river at Borokheri, Ludhua bazar and Kader ponditer hat areas in Ramgati and Kamal Nagar upazila under Lakshmipur District” Project in Upazila-Kamalnagar, Dist.-Lakshmipur under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2021-2022 (Package No.- Lak/W-29/Lot-2/2021-2022) TID  668356 ,Package No.  Lak/W-29/Lot-02/2021-2022 11.10.2022 281,386,828.38 80.00% 225,109,462.70 Executive Engineer, Laksmipur O&M Division,BWDB,
38 River bank protective work along the left bank of Meghna river from km 140.967 to km 141.317 = 350 m including Stair (4nos),Umbrella Shed (4 nos) & Bench (4 nos) at Balur char (km 141.000) in c/w “Protection work at the bank of Meghna river at Borokheri, Ludhua bazar and Kader ponditer hat areas in Ramgati and Kamal Nagar upazila under Lakshmipur District” Project in Upazila-Kamalnagar, Dist.-Lakshmipur under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2021-2022 (Package No.- Lak/W-15/Lot-3/2021-2022). TID 709526,Pakage No.  Lak/W-15/Lot-03/2021-2022 12.07.2023 340,059,852.51 75.00% 255,044,889.38 Executive Engineer, Laksmipur O&M Division,BWDB,
39 River bank protective work along the left bank of Meghna river from km 154.000 to km 154.300 = 300 m in c/w “Protection work at the bank of Meghna river at Borokheri, Ludhua bazar and Kader ponditer hat areas in Ramgati and Kamal Nagar upazila under Lakshmipur District” Project in Upazila-Kamalnagar, Dist.-Lakshmipur under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2021-2022 TID 725433, Package No.  Lak/W-28/Lot-01/2021-2022 27.11.2023 313,810,165.53 75.00% 235,357,624.15 Executive Engineer, Laksmipur O&M Division,BWDB,
40 River bank protective work along the left bank of Meghna river from km 154.300 to km 154.600 = 300 m including Stair (4nos),Umbrella Shed (4 nos) & Bench (4 nos) at Nobigonj Bazar (km 154.357) in c/w “Protection work at the bank of Meghna river at Borokheri, Ludhua bazar and Kader ponditer hat areas in Ramgati and Kamal Nagar upazila under Lakshmipur District” Project in Upazila-Kamalnagar, Dist.-Lakshmipur under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2021-2022 TID  725434 ,Package No.Lak/W-28/Lot-02/2021-2022 27.11.2023 316,025,837.81 75.00% 237,019,378.36 Executive Engineer, Laksmipur O&M Division,BWDB,
41 River bank protective work along the left bank of Meghna river from km 154.600 to km 154.900 = 300 m in c/w “Protection work at the bank of Meghna river at Borokheri, Ludhua bazar and Kader ponditer hat areas in Ramgati and Kamal Nagar upazila under Lakshmipur District” Project in Upazila-Kamalnagar, Dist.-Lakshmipur under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2021-2022. TID  725435,Package No. Lak/W-28/Lot-03/2021-2022 27.11.2023 314,877,001.74 75.00% 236,157,751.31 Executive Engineer, Laksmipur O&M Division,BWDB,
42 Bank Protection work of Length 1.000 km along the Right bank of Bangali river at Jhajhor Hatkhola in Dhunat Upazila of Bogura District in c/w Dredging/Re-excavation of Bangali-Karotoa-Fuljor-Hurasagor River System with Bank Protection Project under Bogura O&M Division BWDB Bogura during the FY 2019-2020 to 2021-2022.TID 435237,Package No.  PWB-27/LOT-02 20.09.2020 175,704,692.91 60.00% 105,422,815.75 Executive Engineer,Bogra O&M Division,BWDB,
43 Repaires and maintenance of slipway at BCG Station Teknaf. 28.11.2023 30,513,020.69 100.00% 30,513,020.69 Assistant Director,Bangladesh Coast Guard
44 Pre-cautionary protective work along the left bank Padma river from Km 27.650 to Km. 28.400=750.00m (Pkg-4) in Dohar upazila,Dhaka Dist. Under Dhaka O&M Division-2,BWDB,Dhaka during the FY 2021-22. 31.07.2022 62,052,000.00 100.00% 62,052,000.00 PD,25 Engineering construction Batalion,Jolshiri Abason,Rupganj
TOTAL     7,627,682,173.807   5,296,104,081.416