Projects
COMPLETED WORS OF SK EMDADUL HAQUE Al MAMUN 2023
Sl | Procuring Entity Details | Name of works | DATE OF COMPLETION | Value of Works | Share of Tenderer |
Tenderer Owned Actual Value of Works | |
1 | Executive Engineer, Gopalganj O&M Division, BWDB, Gopalganj | Bank protective work along the right bank of Baigarkul river at Tungipara Upazila complex in Gopalganj district under Gopalganj O&M Division,BWDB,Gopalganj during the year 2014-15. | 30.06.2016 | 25329922.71 | 100.00% | 25329922.71 | |
2 | Executive Engineer, Khulna O&M Division-2, BWDB, Khulna | Repair of 06 Nos. Sluices (at Gopipagla, Telikhali, Fulbari, Muchimara, Noai, Darunmollik:DS-1) in Polder No-22 under Khulna O&M Division-II, BWDB, Khulna in c/w “Blue Gold Program” during the year 2014-2015 (Package No. e-T/09/KHU2/BLUE GOLD/P-22/2014-15). | 08.09.2015 | 5174084.75 | 100.00% | 5174084.75 | |
3 | Executive Engineer, Gopalganj O&M Division, BWDB, Gopalganj | ePack-05-TPP-PI-2014-15: Construction of Pipe Inlet (0.60m dia) at km. 9.89, km. 11.04, km. 11.54, km. 12.49, km. 12.79, km. 13.29, km. 15.29, km. 15.59, km. 15.89, km. 16.39, km. 17.10 = 11 nos of polder no-5 under Gopalganj O&M Division. BWDB, Gopalganj during the year 2014-15. | 31.03.2016 | 11483726.91 | 100.00% | 11483726.91 | |
4 | Executive Engineer, Gopalganj O&M Division, BWDB, Gopalganj | Re-excavation of Kushly Khal from km 0.000 to km 2.250=2.250km (2) Kushly-Nilfa khal from km 0.000 to km 2.010=2.010 km (3) kushly-ramchanfrapur khal from km 0.000 to km 2.500=2.500km total 6.760 km under Tarail-Pachuria FCDI Project ( Phase II). Polder no-05 in Tungipara Upazila of Gopalganj district during the year 2014-15. | 29.03.2016 | 5207065.77 | 100.00% | 5207065.77 | |
5 | Executive Engineer, Gopalganj O&M Division, BWDB, Gopalganj | Re-excavation of Gohala Uzani Khal in Polder no.- 05 from km0.000 to km. 10.400 = 10.400 km. Under â??West Gopalganj Integrated Water Management Project in Upazilla- Muksudpur, Dist.- Gopalganj. Under Gopalganj O&M Division, BWDB, Gopalganj. During the year 2014-15. | 30.06.2016 | 14218507.75 | 100.00% | 14218507.75 | |
6 | Executive Engineer, Satkhira O&M Division-1, BWDB, Satkhira | Repair of Protective work at the left bank of Kalindi river at Naikati in Polder No.5 from km 31.850 to km 31.950 = 100.00m under NDR Budget under Satkhira O&M Division-1, BWDB, Satkhira during the year 2014-2015. | 07.04.2016 | 10186878.98 | 100.00% | 10186878.98 | |
7 | Executive Engineer, Satkhira O&M Division-1, BWDB, Satkhira | Protective work at the left bank of Ichamati river at Haroddah in Polder No. 1 from km 54.480 to km 54.580 = 100.00m under NDR Budget under Satkhira O&M Division-1, BWDB, Satkhira during the year 2014-2015. | 07.04.2016 | 12556648.31 | 100.00% | 12556648.31 | |
8 | Executive Engineer,Bagerhat O&M Division, BWDB, Bagerhat | Re-excavation of Morga khal from chainage km 0.000 to km 3.500 = 3.500 km under Integrated Water Management Project of Polder 34/2 in Bagerhat district during the year 2013-14 | 28.06.2016 | 2735258.652 | 100.00% | 2735258.65 | |
9 | Executive Engineer,Narail O&M Division, BWDB, Narail | Protective work along the left bank of Nabaganga river from Km. 0.300(D/S) to Km. 0.800 (U/S)=0.500 km at Gazirhat bazar in “Rehabilitation of Bhutiar Beel & Barnal-Salimpur-Kolabashukhali Flood Control & Drainage Project in Khulna District (Phase-II)” under Narail O&M Division during the year 2015-16. | 30.06.2017 | 85266381.78 | 51.00% | 43485854.71 | |
10 | Executive Engineer,Pabna O&M Division, BWDB, Pabna | River bank protective work from Komorpur to Shara-Jhaudia.( Km 2.000 to Km 2.500). | 12.05.2017 | 112111870 | 49.00% | 54934816.28 | |
11 | Executive Engineer, Rajshahi O&M Division, BWDB, Rajshahi | Bank Protection work on the left bank of river Padma at Naboganga from km 3.62 to km 4.17 = 550 m under Rajshahi O&M Division, BWDB, Rajshahi during FY 2016-2017. | 20.06.2018 | 203895402.000 | 49.00% | 99908746.980 | |
12 | Executive Engineer, Manikganj W.D. Division, BWDB, Manikganj | Breach Closing from km 5.400 to km 5.700 = 0.300 km and Construction of Retired Embankment from km 8.30 to km 9.30 = 1.00 km total length 1.300 km along the left bank of Jamuna River in c/w Aricha-Jionpur Flood Control Embankment under Manikganj WD Division, BWDB Manikganj during FY 2016-2017. | 30.04.2018 | 12658182.540 | 100.00% | 12658182.540 | |
14 | Executive Engineer, Satkhira O&M Division-2, BWDB, Satkhira | (A) Temporary Slope Protection with backing of embankment from km 91.400 to km 9.470 = 70m and Backing of embankment from km 91.230 to km 91.400 = 170m ,km 91.470 to km 91.570 = 100m in polder 13-14/2 at Katkata, Upazila-Koyra, Dist-Khulna under Satkhira O&M Division, BWDB, Satkhira during FY 2016-17. | 31.12.2017 | 1385388.310 | 100.00% | 1385388.310 | |
15 | Executive Engineer, Satkhira O&M Division-2, BWDB, Satkhira | Construction of Ring Dyke with Filling of Khal from km 56.360/0.00 to km 58.600/.0=360 = 360 m in Polder No 7/2 in Kurikawnia in upazila Ashashuni, Dist-Satkhira under NDR budget during FY 2016-2017. | 31.12.2017 | 1136308.000 | 100.00% | 1136308.000 | |
16 | Executive Engineer, Satkhira O&M Division-2, BWDB, Satkhira | Construction of Ring Dyke with Filling of Khal from km 10.650/0.00 to km 10.800/0.240=240 m in Polder No 7/2 at Bisot upazila Ashashuni, Dist-Satkhira under NDR budget during FY 2016-2017. | 31.12.2017 | 851166.387 | 100.00% | 851166.387 | |
17 | Executive Engineer, Satkhira O&M Division-2, BWDB, Satkhira | Repair of embankment with Temporary slope protection by laying geotextile bags from km 2.300 to km 3.000 =0.700 km at Horiskhali in Upazila Ashashuni, Dist-Satkhira under NDR budget during 2016-2017. | 31.12.2017 | 1509453.423 | 100.00% | 1509453.423 | |
18 | Executive Engineer, Narail O&M Division, BWDB, Narail | Protective work on the left bank of Naboganga River from km 6.960 to km 7.210 = 250 m at Baraipara Ferryghat upazila-Kalia, Dist-Satkhira in c/w Rehabilitation of Bhutiar beel and Barnol-Salimpur-Kolabashukhali Flood Control and Drainage Project Phase-2 in Khulna district under Narail O&M Division, BWDB ,Narail during 2015-2016. | 26.06.2018 | 44468555.870 | 51.00% | 22678963.494 | |
19 | Executive Engineer, Narail O&M Division, BWDB, Narail | Temporary Protective work on the right bank of Naboganga River from km 64.402 to km 64.460 = 0.058 km, km 64.160 to km 64.180 = 0.020 km at Chandarchar upazila-Kalia, Dist-Narail under Narail O&M Division, BWDB ,Narail during 2016-2017. | 10.12.2017 | 3284930.460 | 51.00% | 1675314.535 | |
20 | Executive Engineer, Narail O&M Division, BWDB, Narail | Temporary Protective work on the right bank of Naboganga River from km 64.093 to km 64.111 = 0.018 km, km 64.123 to km 64.155 = 0.032 km Total 0.050 at Chandarchar upazila-Kalia, Dist-Narail under Narail O&M Division, BWDB ,Narail during 2016-2017. | 10.12.2017 | 2099226.300 | 51.00% | 1070605.413 | |
21 | Executive Engineer, Narail O&M Division, BWDB, Narail | Temporary Protective work on the right bank of Naboganga River from km 64.197 to km 64.317 = 0.120 km at Chandarchar upazila-Kalia, Dist-Narail under Narail O&M Division, BWDB ,Narail during 2016-2017. | 06.12.2017 | 4961770.880 | 51.00% | 2530503.149 | |
22 | Executive Engineer, Khulna O&M Division-2, BWDB, Khulna | Repair of embankment from km 13.600 to km 13.650 at Bigordana in Polder No. 22 under Blue Gold Programme under Khulna O&M Division-2, BWDB, Khulna during 2016-2017 & 2017-2018, Tender ID 109249. | 18.12.2017 | 1991698.000 | 100.00% | 1991698.000 | |
23 | Executive Engineer, Khulna O&M Division-2, BWDB, Khulna | Reexcavation of Changkusulia Khal from km 0.000 to km 1.730 in Polder No. 3 (Part) under Blue Gold Programme under Khulna O&M Division-2, BWDB, Khulna during 2016-2017 & 2017-2018, Tender ID 100274 | 15.03.2018 | 2455413.000 | 100.00% | 2455413.000 | |
24 | Executive Engineer, Satkhira O&M Division-2, BWDB, Satkhira | Construction of Ring Dyke with Filling of Khal from km 28.050/0.00 to km 28.200/0.217=217m in Polder No 7/2 at Kayergati in upazila Ashashuni, Dist-Satkhira under NDR budget during FY 2016-2017. | 28.12.2017 | 1136308.000 | 100.00% | 1136308.000 | |
25 | Executive Engineer, Rajshahi O&M Division, BWDB, Rajshahi | Bank Protection work on the left bank of river Padma at Sonaikandi from km 1.350 to km 1.900 = 550 m under Rajshahi O&M Division, BWDB, Rajshahi during FY 2016-2017. Tender | 27.06.2019 | 224101931.000 | 30.00% | 67230579.300 | |
26 | Executive Engineer, Manikganj W.D. Division, BWDB, Manikganj | Precautionary Protective work along the left bank of Kaliganga River from km 0.000to km 0.165= 0.165 km at Taraghat to protect Ramjan Ali High School at Upazila-Ghior, Dist-Manikganj under Manikganj WD Division, BWDB Manikganj during FY 2018-2019. | 25.06.2019 | 1346892.000 | 100.00% | 1346892.000 | |
27 | Executive Engineer, Manikganj W.D. Division, BWDB, Manikganj | Construction of Retired embankment along the left bank of Jamuna River from km 9.300 to km 9.650 = 350 m in upazila-Doulatpur, Dist-Manikganj under Manikganj WD Division, BWDB Manikganj during year 2018-2019. | 10.02.2018 | 1796622.911 | 100.00% | 1796622.911 | |
28 | Executive Engineer,Khulna O&M Division-1, BWDB, Khulna | Construction of Retired embankment from km 10.880 to km10.910= 30 m in Polder 30 under Khulna O&M Division-2, BWDB, Khulna under Blue Gold Programme during the year 2018-2019 & 2019-20. | 30.06.2019 | 2968500.000 | 100.00% | 2968500.000 | |
29 | Executive Engineer,Khulna O&M Division-1, BWDB, Khulna | Precautionary Repair of Embankment from km 26.486 to km 26.530 = 44m at Baroaria in c/w Blue Gold Programme under Khulna O&M Division, BWDB, Khulna during the year 2017-18 & 2018-19 | 30.09.2018 | 2288017.350 | 100.00% | 2288017.350 | |
30 | Executive Engineer,Khulna O&M Division-1, BWDB, Khulna | Precautionary Repair of Embankment from km 26.445 to km 26.485 = 40 m at in Polder No. 29 at Baroaria in c/w Blue Gold Programme under Khulna O&M Division, BWDB, Khulna during the year 2017-18 & 2018-19 | 30.09.2018 | 2079640.020 | 100.00% | 2079640.020 | |
31 | Executive Engineer, Sirajganj O&M Division, BWDB, Sirajganj | Construction of Bank Revetment work on the right bank of Jamuna River at Khudbandi, Shingrabari and Shuvogacha area in upazila-Kazipur, Dist-Sirajganj during FY 2017-18 & 2018-19. (BRE km 151.300 to km 151.700= 400m). | 31.03.2019 | 197679407.060 | 33.00% | 65234204.330 | |
32 | Executive Engineer, Gopalganj O&M Division, BWDB, RajshahiGopalganj | Tungipara Helipad Area Decorative Gardening in Upazila-Kotalipara, Dist-Gopalganj under Gopalganj O&M Division, BWDB, Gopalganj, Tender ID 463384 | 30.06.2020 | 896859.000 | 100.00% | 896859.000 | |
33 | Executive Engineer, Manikganj W.D. Division, BWDB, Manikganj | Construction of Embankment from km 9.650 to km 9.800=150m of Aricha-Jionpur Flood Control Embankment under Manikganj WD Division, BWDB, Manikganj. TID 399408 | 28.06.2020 | 823033.000 | 100.00% | 823033.000 | |
34 | Executive Engineer, Manikganj W.D. Division, BWDB, Manikganj | 3D Gold Palated SS Letters in front of Tungipara Helipad under Gopalganj O&M Division, BWDB, Gopalganj, TID 463383 | 30.06.2020 | 314266.000 | 100.00% | 314266.000 | |
35 | Executive Engineer, Gopalganj O&M Division, BWDB, RajshahiGopalganj | Temporary Protective work from km 3.330 to km 3.433=133 m to protect College of Aricha-Jionpur Flood Control Embankment under Manikganj WD Division, BWDB, Manikganj. TID 127943 | 25.06.2020 | 7810448.000 | 100.00% | 7810448.000 | |
36 | Executive Engineer, Manikganj W.D. Division, BWDB, Manikganj | Emergency supply of geobags for emergency protective work under Manikganj WD Division, BWDB, Manikganj. TID 458155 | 24.06.2020 | 3022220.000 | 100.00% | 3022220.000 | |
37 | Executive Engineer, Lalmonirhat O&M Division, BWDB, Lalmonirhat | Bank Revetment work along the right bank of Giridhary River from km 0.260 to km 0.600=340m in Upazila Aditmary, District Lalmonirhat under Lalmonirhat O&M Division, BWDB, Lalmonirhat | 25.06.2020 | 47375000.000 | 100.00% | 47375000.000 | |
38 | Executive Engineer, Lalmonirhat O&M Division, BWDB, Lalmonirhat | Repair & Rehabilitation of Chandimary Spur at km 18.890 of Teesta River in UP Mohiskhola, Upazila-Aditmary, Lalmonirhat during 2019-2020 under Lalmonirhat O&M Division, BWDB, Lalmonirhat | 25.06.2020 | 8910000.000 | 100.00% | 8910000.000 | |
39 | Executive Engineer Khulna O&M Div-2, BWDB, Khulna | Precautionary protective work along the L/B of Bhadra river from km. 29.600 to krn. 29.633 total 0.033krn. at l.axnrikhola Ylazar in Polder No. 31 wtder Non-Development Revenue Budget during theyear 2A19-7020. | 25.06.2020 | 2810172.000 | 100.00% | 2810172.000 | |
40 | Executive Engineer Khulna O&M Div-2, BWDB, Khulna | Precantionary protective work along the R/B of Clhurkuri river from km. 43.800 to krn. 43’833 total 0.033krn. at Courkathi rn Polder No. 31 under NouDevelopment Revenue Budget during the year 2019-7424. | 25.06.2020 | 2315200.000 | 100.00% | 2315200.000 | |
41 | Executive Engineer, Chittagong O&M Division-1, BWDB. Chittagong | Construction of Drainage Sluice (l -vent: 1.50m. X 1.80m.) over Mahatammar Chara khal in Halim Khans Char of Char kanai Village at Habilash Dwip Union in Patiya Upazilla, Dist. Chittagong under NDR Budget during the year 2016-17,(e-GP-05/NDR/Sluice/2016-17) TID: 75346 | 29.03.2018 | 14289386.030 | 100.00% | 14289386.030 | |
42 | Executive Engineer, Chittagong O&M Division-1, BWDB. Chittagong | Bank Protection wot’k of Marginal-Dyke liom knr.29.016 to km.29.350: 334.00ni. at Sarenga of Raipur Union in Upazrlla Anowara, DistrictChittagong under Polder No-63/lA during the year’ 2011-18 (e-GP- .18tA DP/Sarensai llPW/201 7- I 8) “l-ender lD: I 5 l08ti | 15.08.2019 | 72936335.173 | 100.00% | 72936335.173 | |
43 | Executive Engineer, Sirajganj O&M Division, BWDB. Sirajganj | Breach Closing and Embnakment resectioning work from m-4087 to m 4141 = 56m near Bahalbari, m 7982-m 8000= 18m near Ratonpur & m 24485-m 24565 =80m near Charbhangura under Sirajganj O&M Division, BWDB, Sirajganj during 2019-2020. | 18.06.2020 | 1166078.732 | 100.00% | 1166078.732 | |
44 | Executive Engineer, Sirajganj O&M Division, BWDB. Sirajganj | Repair & Maintenance of houses and Construction of Shed in BWDB Colony & Newly Constructed Rest House under Sirajganj O&M Division, BWDB, Sirajganj during 2019-2020. | 28.06.2020 | 1093862.085 | 100.00% | 1093862.085 | |
45 | Executive Engineer, Sirajganj O&M Division, BWDB. Sirajganj | Ditch and Pond Filling Work along C/S and R/S of Embankment to prevent the breach of BRE in Between km 138.460 to km 150.000 under Sirajganj O&M Division, BWDB, Sirajganj during 2019-2020. | 28.06.2020 | 4043705.252 | 100.00% | 4043705.252 | |
46 | Executive Engineer, Satkhira O&M Division-1, BWDB, Satkhira | Temporary Slope Protection Work at Gagramari in Polder No. 15 from km 10.500 to km 10.750 Total 0.250 km under Operation Budget at Satkhira O&M Division-1, BWDB, Satkhira during the year 2019-2020. (Package No. Sat-1/W-8/2019-2020), TID No-387788) | 20.05.2020 | 3065764.000 | 100.00% | 3065764.000 | |
47 | Executive Engineer, Satkhira O&M Division-1, BWDB, Satkhira | Temporary Slope Protection Work at Gabura in Polder No. 15 from km 19.575 to km 19.824 Total 0.260 km under Operation Budget at Satkhira O&M Division-1, BWDB, Satkhira during the year 2019-2020. (Package No. Sat-1/W-6/2019-2020), TID No-387786) | 20.05.2020 | 2416481.000 | 100.00% | 2416481.000 | |
48 | Executive Engineer, Bagerrhat O&M Division-1, BWDB, Bagerhat | Repair & Resectioning of Embankment in between km 14.000 to km 15.000 total 0.500 km in Najirpur Project in Sadar Upazila Dist Bagerhat under Bagerhat O&M Division BWDB Bagerhat during the year 2019-2020 | 31.05.2020 | 1619311.955 | 100.00% | 1619311.955 | |
49 | Executive Engineer, Chittagong O&M Division-1, BWDB, Chittagong | Construction of Ichamati-kodala Khal Closure from km 21.630 to km 21.685=55.00m under Polder No- 63/1B during the yaer 2017-18(e-GP-46/ADP/Ichamati/kodala/Closure/2017-18) | 18.05.2019 | 13554376.400 | 100.00% | 13554376.400 | |
50 | Executive Engineer, Gopalganj O&M Division-1, BWDB, Gopalganj | Emergency Protective work Along The right Bank of Baigerkul River From km 25.495 to km 25.530=35.00M In Munshipara At Tungipara Upazila Under Gopalganj O&M Division,BWDB,Gopalganj under Non Development Revinue Budget(NDR),During the yaer 2018-19.DMP 14/2018-19 | 31.05.2019 | 2097000.000 | 100.00% | 2097000.000 | |
51 | Executive Engineer, Gopalganj O&M Division-1, BWDB, Gopalganj | Emergency Protective work Along The right Bank of Baigerkul River From km 25.449 to km 25.494=45.00M In Munshipara At Tungipara Upazila Under Gopalganj O&M Division,BWDB,Gopalganj.Under Non Development Revinue Budget(NDR),During the yaer 2018-19.DMP 13/2018-19 | 31.05.2019 | 2697000.000 | 100.00% | 2697000.000 | |
52 | Executive Engineer, Khulna O&M Division-1, BWDB, Khulna | Repair & protection of embankment from Km 10.880 to Km 10.950=70 m in Polder No 30 Under Khulna O&M Division-2,BWDB, Khulna under Blue Gold Program (BWDB,Component) during the year 2018-2019 & 2019-20. Package No-15/K-2/BGP/2018-19,Tender ID-322018 | 30.06.2019 | 2968500.000 | 100.00% | 2968500.000 | |
53 | Executive Engineer, Khulna O&M Division-1, BWDB, Khulna | Construction of Kadomtola Drainage Cum Flushing Sluice (1v-0.90m*1.20m) at km 8.545 in Polder No.26 at upazila Dumuria District Khulna in connection with Blue Gold Program under Khulna O&M Division-1 BWDB Khulna during the year 2018-19 & 2019-2020.Package No- 17/K-1/BGP/2018-19 & Tender ID No- 263616 | 30.05.2019 | 16992628.000 | 100.00% | 16992628.000 | |
54 | Executive Engineer, Bagerhat O&M Division-1, BWDB, Bagerhat | Construction of RCC River Name Plate at different Location of Bagerhat District under Bagerhat O&M Division under Non-Development Revenue NDR Budget During the year 2019-20.Package No- BAG/NDR/OTM/Package-11/2019-2020,Tender ID- 402435 | 31.03.2020 | 1236920.478 | 100.00% | 1236920.478 | |
55 | Executive Engineer, Chittagong O&M Division-1, BWDB, Chittagong | Height Raising work of Sea-Dyke from km 39.142 to km 40.229(1028m) and from km 40.629 to km 41.092 (463m) total=1550m at Gahira and Batighar in Raipur Union,Upazila-Anowara under polder no 63/1A in connection with “Rehabilitation of coastal polder no- 62(Patenga), 63/1A (Anowara), 63/1B(Anowara & Patiya) in Chittagong District in Patiya-Anowara,District-Chittagong during the year 2016-17(e-Gp-15/Embkt/63/1A/2016-17) | 15.08.2019 | 18600000.000 | 100.00% | 18600000.000 | |
56 | Executive Engineer, Joypurhat O&M Division-1, BWDB, Joypurhat | Re-Excavation of Tulshiganga River from Km. 5.000 to Km 15.000 = 10.00 km in C/W “Re-Excavation of Tulshiganga, Little Jamuna, Chiri & Harabari River of Joypurhat District” Project during the FY 2019-2020, e-GP Tender ID No. 425732, Package No: JOY-W-04/2019-2020. | 10.01.2021 | 140036171.985 | 49.00% | 48559000.000 | |
57 | Executive Engineer, Kurigram O&M Division-1, BWDB, Kurigram | Emergency precautionary protective work on the right bank of flood control embankment of Brahmaputra river from km 52.700 to km 53.200 500m anantopur area at upazila-Ulipur District kurigram during 2019-2020 | 31.12.2020 | 37979209.840 | 100.00% | 37979209.840 | |
58 | Executive Engineer, Chittagong O&M Division-1, BWDB, Chittagong | Supplying HP Toner,EPSON Ink,2518A Toner,NPG51 Toner for Chittagong BWDB Office during the FY 2020-2021,Chittagong O&M Division-1 | 03.05.2021 | 24295.000 | 100.00% | 24295.000 | |
59 | Executive Engineer, Chittagong O&M Division-1, BWDB, Chittagong | Supplying HP Toner,EPSON Ink for Chittagong BWDB Office during the FY 2020-2021,Chittagong O&M Division-1 | 03.05.2021 | 24295.000 | 100.00% | 24295.000 | |
60 | Executive Engineer, Chittagong O&M Division-1, BWDB, Chittagong | Supplying Level Book(LB) for Chittagong BWDB Office during the FY 2020-2021,Chittagong O&M Division-1 | 20.05.2021 | 24725.000 | 100.00% | 24725.000 | |
61 | Executive Engineer, Faridpur O&M Division-1, BWDB, Faridpur | Re-excavation of Naldanga Khal from KM 0.00 to KM 4.372=4.372 KM in C/W Re-excavation of small River Khal and Water Bodies in 64 District Phase-1 in Upazila Boalmari,District Faridpur under Faridpur O&M Division,BWDB,Faridpur,during the FY 2019-2020.TID 389114 | 30.05.2021 | 2041459.810 | 100.00% | 2041459.810 | |
62 | Executive Engineer, Manikganj O&M Division-1, BWDB, Manikganj | Supplying of 100% Polyster geo-textile bags (empty) for emergency works under Manikganj WD Division, BWDB, Manikganj during the financial year 2020-21. | 28.06.2021 | 3050014.109 | 100.00% | 3050014.109 | |
63 | Executive Engineer, Manikganj O&M Division-1, BWDB, Manikganj | Precautionary Protective work along the Right Bank of Kaligonga River to Protect Ghusta Bazar and its adjacent area from km.25.250 to km.25.400= 150 m and km.25.700 to km.25.900= 200 m Total= 350.00 m in Upazila:- Manikganj Sadar, District:-Manikganj under Manikganj WD Division, BWDB, Manikganj during the year 2020-21. | 31.08.2021 | 16418000.00 | 100.00% | 16418000.000 | |
64 | Executive Engineer, Joypurhat O&M Division-1, BWDB, Joypurhat | Re-Excavation of Little Jamuna River From Km. 11.750 to Km. 23.300 Total 11.550 Km. in Connection With Re-Excavation of Tulshiganga Little Jamuna Chiri & Harabati River of Joypurhat District Project during the FY 2020-2021. | 04.06.2021 | 162753563.03 | 49.00% | 40082000.000 | |
65 | Executive Engineer, Rangpur O&M Division-1, BWDB, Rangpur | Protective work on the Right Bank of the River Ghagot from Km. 0.000 to Km. 0.400400m at Garalchaki in Upazila Mithapukur Dist. Rangpur Under Rangpur O&M DivisionBWDBRangpur | 28.06.2021 | 43376697.043 | 100.00% | 43376697.043 | |
66 | Executive Engineer, Shariatpur O&M Division-1, BWDB, Shariatpur | River Bank Protection Work along the left Bank of Padma River from Km 1.015 to Km 1.230 0.215 Km at Char Atra in Upazilla Naria of Shariatpur District under Shariatpur O&M Division BWDB Shariatpur during the year 2019-2020 & 2020-21 | 02.09.2021 | 136657234.978 | 100.00% | 136657234.978 | |
67 | Executive Engineer, Kurigram O&M Division-1, BWDB, Kurigram | Bank Revetment Work on the Right Bank of Brahmaputra River from KM 56.800 to KM 57.300500m at Fakirerhat Area in Union Ranigonj Upazila Chilmari District Kurigram during 2019-2020 & 2020-2021. | 16.11.2021 | 314782378.560 | 49.00% | 117951024.240 | |
68 | Executive Engineer, Satkhira O&M Division-1, BWDB, Satkhira | Re-excavation of Pashmamunda khal From km-0.000 to km-3.500 total 3.500 km at Shyamnagar upazilla in Satkhira District under Small River/ Khal/Pond re-excavation project in 64 district 1st phase during the year 2020-21. | 20.06.2021 | 6298534.725 | 100.00% | 6298534.725 | |
69 | Executive Engineer, Manikganj WD Division, BWDB, Manikganj | Precautionary protective work along the Left bank of Jamuna River from km.1.500 to km. 2.150 = 650 m at Bachamara in C/W River Bank Protection Works at Bachamara, Bahadurpur and Dhulsura area to Protect from River Bank Erosion at Manikganj District under Mankiganj WD Division, BWDB, Manikganj during the FY- 2021-22 & 2022-23.TID 606521,Package No. M-W-01/2021-22 | 30.03.2022 | 70313199.147 | 51.00% | 35859731.565 | |
70 | Executive Engineer, Faridpur O&M Division, BWDB, Faridpur | Protective Work along the Right Bank of Arial Khan River from KM 0.300 to KM 0.600 = 300.00 M at Chandrapara in C/W “Bank Protective Work & Dredging Project in Arial Khan River in Faridpur District” in Upzallia- Sadarpur, District- Faridpur.TID 596124 | 26.06.2022 | 88256753.140 | 49% | 43245809.039 | |
71 | Executive Engineer, Faridpur O&M Division, BWDB, Faridpur | Protective Work along the Right Bank of Arial Khan River from KM 0.600 to KM 0.900 = 300.00 M at Chandrapara in C/W “Bank Protective Work & Dredging Project in Arial Khan River in Faridpur District” in Upzallia- Sadarpur, District- Faridpur.TID 596125 | 26.06.2022 | 83567413.810 | 49% | 40948032.767 | |
72 | Executive Engineer, Faridpur O&M Division, BWDB, Faridpur | Protective Work along the Right Bank of Arial Khan River from KM 0.900 to KM 1.200 = 300.00 M (With D/S Entermination) at Chandrapara in C/W “Bank Protective Work & Dredging Project in Arial Khan River in Faridpur District” in Upzallia- Sadarpur, District- Faridpur.TID 596126 | 30.06.2022 | 112840509.180 | 49% | 55291849.498 | |
73 | Executive Engineer, Faridpur O&M Division, BWDB, Faridpur | Protective Work along the Right Bank of Arial Khan River from KM 0.600 to KM 0.815 = 215.00m at Duair Darga Bazar in C/W “Bank Protective Work & Dredging Project in Arial Khan River in Faridpur District” in Upazilla: Bhanga, District: Faridpur 2020-21. TID 596127 | 25.06.2022 | 40720073.780 | 100% | 40720073.780 | |
74 | Executive Engineer, Faridpur O&M Division, BWDB, Faridpur | Protective Work along the Right Bank of Arial Khan River from KM 0.815 to KM 1.200 = 385.00 m (with D/S End termination) at Duair Darga Bazar in C/W “Bank Protective Work & Dredging Project in Arial Khan River in Faridpur District” in Upazilla: Bhanga, District: Faridpur 2020-21.TID 596128 | 30.06.2022 | 96881550.640 | 49% | 47471959.814 | |
75 | Executive Engineer, Chittagong O&M Division-1, BWDB, Chittagong | Height Raising work of Sea-Dyke from Km. 36.142 to Km. 40.229(1087m) and from Km. 40.629 to Km. 41.092(463m) totoal=1550m at Gahira and Batighar in Raipur Union,Upazila-Anowara under Polder No. 63/1A in connection with “Rehabili8tation of Coastal Polder No. 62(Patenga),63/1A (Anowara & Patiya) in Chittagong District” in Patiya-Anowara,District chittagong during the year 2016-17(e-GP-15/Embkt/63/1A/2016-17) | 15.08.2019 | 31817174.610 | 100% | 31817174.610 | |
76 | Executive Engineer, Satkhira O&M Division-2, BWDB, Satkhira | Emergency temporary repair of Embankment with slope protection work from Km. 24.230 to Km. 24.710=480.00 meter at purba Jhapa in polder No. 7/1 at Padmapukur Union,Upazila-Shyamnagar,Dist Satkhira under Satkhira O&M Division-2,BWDB,Satkhira in the FY 2021-22,Package No. DPM-YAAS-23/2021-22 | 24.07.2021 | 1485000.000 | 100% | 1485000.000 | |
77 | Executive Engineer, Satkhira O&M Division-2, BWDB, Satkhira | Resectioning work of embankment along-with precautionary slope protection work by geo bag from Km. 23.630 to Km. 24.100 equal 470 meter in Polder No. 7/1 along the L/B of Kholpetua River at Kamalkathi Union-Padmapukur Upazila-Shyamnagar District- Satkhira under Satkhira O&M Division-2 BWDB Satkhira. | 30.06.2021 | 7358500.000 | 100% | 7358500.000 | |
78 | Executive Engineer, Sirajgabj O&M Division-2, BWDB, Sirajganj | Temporary Emergency protection work at Cross bar-3 Dredging of River syatem in Bangladesh(CDRSB) in Sirajganj Sadar Upazila District-Sirajgabj Under Sirajganj O&M Division,BWDB,Sirajganj during the yaer 2019-20. | 28.10.2019 | 230000.000 | 100% | 230000.000 | |
79 | Executive Engineer, Satkhira O&M Division-2, BWDB, Satkhira | Emergency Construction of 25.00 meter Breach Closing & Approach Embankment with slope protection work from Km. 24.770 to Km. 24.915 =145 meter at Dahkhin Jhapa in polder No. 7/l at Padmapukur Union, Upazilta- Shyamnagar, Dist. Satkhira under Satkhira O&M Division-2, BWDB, Satkhira in the FY 2021-22. Package No. DPMY AAS-24n02b2022 |
24.07.2021 | 1019000.000 | 100% | 1019000.000 | |
80 | Executive Engineer, Satkhira O&M Division-2, BWDB, Satkhira | Emergency Construction of 40.00 meter Breach Closing & Approach Embankment with Slope protection work from Km. 25.065 to Km. 25.230=165 meter at Dahkhin jhapa in polder No. 7/1 at Padmapukur Union,Upazila Shyamnagar,Dist Satkhira under Satkhira O&M Division-2,BWDB,Satkhira in the FY 2021-22,Package No. DPM-YAAS-25/2021-22 | 24.07.2021 | 1314000.000 | 100% | 1314000.000 | |
81 | Executive Engineer, Faridpur O&M Division, BWDB, Faridpur | Protective Work along the Right Bank of Padma River from KM 17.420 to KM 17.650 = 230.00 M at Fazil Kha Dangi & Balia Dangi in C/W ” Bank Protective work & Dredging Project along The Right Bank of Padma River” in Upzallia- Charbhadrasion, District- Faridpur Under Faridpur O & M Division, BWDB, Faridpur During the FY 2021-22 (Package No-PADMA-13/PW/FBD/2021-22), PADMA-13/PW/FBD/2021-22,TID 626572 | 25.05.2023 | 93780359.247 | 100% | 93564364.990 | |
82 | Executive Engineer, Faridpur O&M Division, BWDB, Faridpur | KUMAR/DREG-01/02/2021-22 Remaining Portion of Dredging work of Kumar River from Ch. km 16.477 to km 26.877 = 10.40 KM Re-excavation of Kumar River Project under Faridpur O & M Division, BWDB, Faridpur during the FY 2021-22 (Part-2), KUMAR/DREG-01/02/2021-22,TID 689753 | 14.01.2023 | 19474721.693 | 100% | 19447994.830 | |
83 | Executive Engineer, Faridpur O&M Division, BWDB, Faridpur | Remaining Portion of Dredging work of Kumar River from Ch. km 26.877 to km 27.577 = 0.700 KM Re-excavation of Kumar River Project under Faridpur O&M Division, BWDB, Faridpur during the FY 2021-22. (Part-01), KUMAR/DREG-03/01/2021-22.TID 690656 | 15.01.2023 | 14796364.221 | 100% | 14375300.710 | |
84 | Executive Engineer, Faridpur O&M Division, BWDB, Faridpur | Remaining Portion of Dredging work of Kumar River from Ch. km 26.877 to km 27.577 = 0.700 KM Re-excavation of Kumar River Project under Faridpur O&M Division, BWDB, Faridpur during the FY 2021-22. (Part-02) KUMAR/DREG-03/02/2021-22.TID 690776 | 15.01.2023 | 15743555.968 | 100% | 15352652.260 | |
85 | Executive Engineer, Faridpur O&M Division, BWDB, Faridpur | Protective Work along the Right Bank of Padma River from KM 17.190 to KM 17.420 = 230.00 M at Fazil Kha Dangi & Balia Dangi in C/W ” Bank Protective work & Dredging Project along The Right Bank of Padma River” in Upzallia- Charbhadrasion, District- Faridpur Under Faridpur O & M Division, BWDB, Faridpur During the FY 2021-22 (Package No-PADMA-12/PW/FBD/2021-22) PADMA-12/PW/FBD/2021-22, TID 626559 | 02.03.2023 | 95034251.630 | 80% | 76027401.304 | |
86 | Executive Engineer, Faridpur O&M Division, BWDB, Faridpur | Protective Work along the Right Bank of Padma River from KM 17.650 to KM 17.880 = 230.00 M at Fazil Kha Dangi & Balia Dangi in C/W ” Bank Protective work & Dredging Project along The Right Bank of Padma River” in Upzallia- Charbhadrasion, District- Faridpur Under Faridpur O & M Division, BWDB, Faridpur During the FY 2021-22 (Package No-PADMA-14/PW/FBD/2021-22), PADMA-14/PW/FBD/2021-22,TID 626590 | 25.05.2023 | 115203403.170 | 80% | 92162722.536 | |
87 | Executive Engineer, Rajbari O&M Division, BWDB, Rajbari | Rehabilitation of protective work along the R/B of padma river From km. 54.600 to km 54.747 = 147m in c/w “Rajbari Town Protection (Phase-II )(1st Revised)” at Location: Godarbazar, Union: Mijanpur, Upazilla: Rajbari Sadar , Dist. Rajbari under Rajbari O&M Division, BWDB, Rajbari during the FY 2021-22. TID 644381,Package No.RW-RAJ-05 | 30.06.2022 | 103149825.214 | 49% | 48016711.073 | |
88 | Executive Engineer, Rajbari O&M Division, BWDB, Rajbari | Rehabilitation of protective work along the R/B of padma river from km 55.016 to km 55.169=153 m in c/w “Rajbari Town Protection (Phase-II )(1st Revised)” at Location: Godarbazar, Union: Mijanpur, Upazilla: Rajbari Sadar , Dist. Rajbari under Rajbari O&M Division, BWDB, Rajbari during the FY 2021-22.TID 644390,Package No.RW-RAJ-07 | 30.06.2022 | 100336346.064 | 49% | 46198987.126 | |
89 | Executive Engineer, Natore O&M Division, BWDB, Natore | River bank protection work on the right bank of Barnai river from Km. 28.500 to Km. 28.800 300 m. at Punduri Upazila- Singra District- Natore under Natore O&M Division BWDB Natore during the year 2020-21.TID 529152 | 18.01.2023 | 28600000.000 | 100% | 23078140.000 | |
90 | Executive Engineer, Gopalganj O&M Division, BWDB, Gopalganj | River Bank Protective work along the right bank of MBR channel from km. 0.000 to km. 0.400 = 400m at Dumdia, Union-Urfi in Upazilla-Gopalganj Sadar, District-Gopalganj under Gopalganj O&M Division, BWDB, Gopalganj in C/W “West Gopalganj Integrated Water Management Project (2nd Phase)” during the year 2021-2022.TID 640282,Package No. WG/WMP-II MM-PW-07 | 30.06.2023 | 92657640.232 | 49% | 45402243.714 | |
91 | Executive Engineer, Gopalganj O&M Division, BWDB, Gopalganj | River Bank Protective Work along the Left Bank of Madhumati River from km 0.000 to km 0.250 = 250m at Dubshi Mollapara, Upazil-Gopalganj Sadar, Dist: Gopalganj under Gopalganj O&M Division, BWDB Gopalganj in C/W ‘West Gopalganj Integrated Water Management Project (Phase-II)’ during the year 2021-2022. TID 640283,Package No. WGIWMP-II_MBR_PW-03. | 30.06.2023 | 70631235.518 | 49% | 34609305.404 | |
92 | Executive Engineer, Gopalganj O&M Division, BWDB, Gopalganj | River Bank Protective Work along the Left Bank of Modhumoti River from km. 0.000 to km. 0.250 = 250.00m at Char Dolaitola, in Upazilla- Gopalganj Sadar, Dist : Gopalganj Under Gopalganj O&M Division, BWDB Gopalganj in connection with “West Gopalganj Integrated Water Management Project (Phase-II)” During the year 2021-2022.TID 638966,Package no. WGIWMP-II_MM_PW-02 | 30.06.2023 | 74200503.415 | 100% | 74200503.415 | |
93 | Executive Engineer, Rangpur O&M Division, BWDB, Rangpur | Protective/ Kor-12 420 m River Bank Protection work along the Left bank of Korotoya river at Sulalondhapur in UZ. Pirgonj, Dist. Rangpur under Rangpur O&M Division, BWDB, Rangpur. TID 651808 |
30.06.2023 | 67002976.258 | 100% | 66985674.000 | |
94 | Executive Engineer, Rangpur O&M Division, BWDB, Rangpur | Protective/ Kor-13 500m River Bank Protection work along the Left bank of Korotoya river at Chak veka in UZ. Pirgonj, Dist. Rangpur under Rangpur O&M Division, BWDB, Rangpur.TID 651809 |
30.06.2023 | 69052983.797 | 100% | 58913241.000 | |
95 | Executive Engineer, Bogura O&M Division, BWDB, Bogura | Bank Protection work of Length 0.900 km along the Right bank of Bangali river at Binodpur & Shahebbari in Sherpur Upazila of Bogura District in c/w Dredging/Re-excavation of Bangali-Karotoa-Fuljor-Hurasagor River System with Bank Protection Project under Bogura O&M Division BWDB Bogura during the FY 2019-2020 to 2021-2022.TID 435231,Package No. PWB-17/LOT-02 | 29.12.2022 | 177850000.000 | 70% | 124495000.000 | |
EED,Rangpur :
|
|||||||
Sl No. | Procuring Entity Details | Name of works | DATE OF COMPLETION | Value of Works | Share of Tenderer |
Tenderer Owned Actual Value of Works | |
96 | Executive Engineer, EED, Lalmonirhat | Construction of 05 storied Academic cum Workshop Building with 05 storied foundation in/c. Sanitary & Water supply, Electrification, Generator & Deep Tube Well Works at Lalmonirhat Technical School & College, Sadar, Lalmonirhat,TID: 403951,Package No. XEN/EED/KZ/64TSC/Lalmonirhat TSC/19-20/02 | 25.10.2023 | 70215832.000 | 49.00% | 34405757.680 | |
Bangladesh Coast Guard:
|
|||||||
Sl No. | Procuring Entity Details | Name of works | DATE OF COMPLETION | Value of Works | Share of Tenderer |
Tenderer Owned Actual Value of Works | |
97 | Assistant Director,Bangladesh Coast Guard | Ccutstruction of Boundary wall and Barbed wire felrcing at BCG Station Sudurchar | 20.06.2023 | 27803605.800 | 100.00% | 27803605.800 |