Projects

COMPLETED WORS OF SK EMDADUL HAQUE Al MAMUN 2023

Sl Procuring Entity Details Name of works DATE OF COMPLETION Value of Works Share of
Tenderer
Tenderer Owned Actual Value of Works
1 Executive Engineer, Gopalganj O&M  Division, BWDB, Gopalganj Bank protective work along the right bank of Baigarkul river at Tungipara Upazila complex in Gopalganj district under Gopalganj O&M Division,BWDB,Gopalganj during the year 2014-15. 30.06.2016 25329922.71 100.00% 25329922.71
2 Executive Engineer, Khulna O&M  Division-2, BWDB, Khulna Repair of 06 Nos. Sluices (at Gopipagla, Telikhali, Fulbari, Muchimara, Noai, Darunmollik:DS-1) in Polder No-22 under Khulna O&M Division-II, BWDB, Khulna in c/w “Blue Gold Program” during the year 2014-2015 (Package No. e-T/09/KHU2/BLUE GOLD/P-22/2014-15). 08.09.2015 5174084.75 100.00% 5174084.75
3 Executive Engineer, Gopalganj O&M  Division, BWDB, Gopalganj ePack-05-TPP-PI-2014-15: Construction of Pipe Inlet (0.60m dia) at km. 9.89, km. 11.04, km. 11.54, km. 12.49, km. 12.79, km. 13.29, km. 15.29, km. 15.59, km. 15.89, km. 16.39, km. 17.10 = 11 nos of polder no-5 under Gopalganj O&M Division. BWDB, Gopalganj during the year 2014-15. 31.03.2016 11483726.91 100.00% 11483726.91
4 Executive Engineer, Gopalganj O&M  Division, BWDB, Gopalganj Re-excavation of Kushly Khal from km 0.000 to km 2.250=2.250km (2) Kushly-Nilfa khal from km 0.000 to km 2.010=2.010 km  (3) kushly-ramchanfrapur khal from km 0.000 to km 2.500=2.500km total 6.760 km under Tarail-Pachuria FCDI Project ( Phase II). Polder no-05 in Tungipara Upazila of Gopalganj district during the year 2014-15. 29.03.2016 5207065.77 100.00% 5207065.77
5 Executive Engineer, Gopalganj O&M  Division, BWDB, Gopalganj Re-excavation of Gohala Uzani Khal in Polder no.- 05 from km0.000 to km. 10.400 = 10.400 km. Under â??West Gopalganj Integrated Water Management Project in Upazilla- Muksudpur, Dist.- Gopalganj. Under Gopalganj O&M Division, BWDB, Gopalganj. During the year 2014-15. 30.06.2016 14218507.75 100.00% 14218507.75
6 Executive Engineer, Satkhira O&M  Division-1, BWDB, Satkhira Repair of Protective work at the left bank of Kalindi river at Naikati in Polder No.5 from km 31.850 to km 31.950 = 100.00m under NDR Budget under Satkhira O&M Division-1, BWDB, Satkhira during the year 2014-2015. 07.04.2016 10186878.98 100.00% 10186878.98
7 Executive Engineer, Satkhira O&M  Division-1, BWDB, Satkhira Protective work at the left bank of Ichamati river at Haroddah in Polder No. 1 from km 54.480 to km 54.580 = 100.00m under NDR Budget under Satkhira O&M Division-1, BWDB, Satkhira during the year 2014-2015. 07.04.2016 12556648.31 100.00% 12556648.31
8 Executive Engineer,Bagerhat O&M  Division, BWDB, Bagerhat Re-excavation of Morga khal from chainage km 0.000 to km 3.500 = 3.500 km under Integrated Water Management Project of Polder 34/2 in Bagerhat district during the year 2013-14 28.06.2016 2735258.652 100.00% 2735258.65
9 Executive Engineer,Narail O&M  Division, BWDB, Narail Protective work along the left bank of Nabaganga river from Km. 0.300(D/S) to Km. 0.800 (U/S)=0.500 km at Gazirhat bazar in “Rehabilitation of Bhutiar Beel & Barnal-Salimpur-Kolabashukhali Flood Control & Drainage Project in Khulna District (Phase-II)” under Narail O&M Division during the year 2015-16. 30.06.2017 85266381.78 51.00% 43485854.71
10 Executive Engineer,Pabna O&M  Division, BWDB, Pabna River bank protective work from Komorpur to Shara-Jhaudia.( Km 2.000 to Km 2.500). 12.05.2017 112111870 49.00% 54934816.28
11 Executive Engineer, Rajshahi O&M Division, BWDB, Rajshahi Bank Protection work on the left bank of river Padma at Naboganga from km 3.62 to km 4.17 = 550 m under Rajshahi O&M Division, BWDB, Rajshahi during FY 2016-2017. 20.06.2018 203895402.000 49.00% 99908746.980
12 Executive Engineer,  Manikganj W.D. Division, BWDB, Manikganj Breach Closing from km 5.400 to km 5.700 = 0.300 km and Construction of Retired Embankment from km 8.30 to km 9.30 = 1.00 km total length 1.300 km along the left bank of Jamuna River in c/w Aricha-Jionpur Flood Control Embankment under Manikganj WD Division, BWDB Manikganj during FY 2016-2017. 30.04.2018 12658182.540 100.00% 12658182.540
14 Executive Engineer, Satkhira O&M Division-2, BWDB, Satkhira (A) Temporary Slope Protection with backing of embankment from km  91.400 to km 9.470 = 70m and Backing of embankment from km 91.230 to km 91.400 = 170m ,km 91.470 to km 91.570 = 100m in polder 13-14/2 at Katkata, Upazila-Koyra, Dist-Khulna under Satkhira O&M Division, BWDB, Satkhira during FY 2016-17. 31.12.2017 1385388.310 100.00% 1385388.310
15 Executive Engineer, Satkhira O&M Division-2, BWDB, Satkhira Construction of Ring Dyke with Filling of Khal from km 56.360/0.00 to km 58.600/.0=360  = 360 m  in Polder No 7/2 in Kurikawnia in upazila Ashashuni, Dist-Satkhira under NDR budget during FY 2016-2017. 31.12.2017 1136308.000 100.00% 1136308.000
16 Executive Engineer, Satkhira O&M Division-2, BWDB, Satkhira Construction of Ring Dyke with Filling of Khal from km 10.650/0.00 to km 10.800/0.240=240 m  in Polder No 7/2 at Bisot upazila Ashashuni, Dist-Satkhira under NDR budget during FY 2016-2017. 31.12.2017 851166.387 100.00% 851166.387
17 Executive Engineer, Satkhira O&M Division-2, BWDB, Satkhira Repair of embankment with Temporary slope protection by laying geotextile bags  from km 2.300 to km 3.000 =0.700 km at Horiskhali in Upazila Ashashuni, Dist-Satkhira under NDR budget during 2016-2017. 31.12.2017 1509453.423 100.00% 1509453.423
18 Executive Engineer, Narail O&M Division, BWDB, Narail Protective work on the left bank of Naboganga River from km 6.960 to km 7.210 = 250 m at Baraipara Ferryghat upazila-Kalia, Dist-Satkhira in c/w Rehabilitation of Bhutiar beel and Barnol-Salimpur-Kolabashukhali Flood Control and Drainage Project Phase-2 in Khulna district under Narail O&M Division, BWDB ,Narail during 2015-2016. 26.06.2018 44468555.870 51.00% 22678963.494
19 Executive Engineer, Narail O&M Division, BWDB, Narail Temporary Protective work on the right bank of Naboganga River from km 64.402 to km 64.460 = 0.058 km, km 64.160 to km 64.180 = 0.020 km at Chandarchar upazila-Kalia, Dist-Narail  under Narail O&M Division, BWDB ,Narail during 2016-2017. 10.12.2017 3284930.460 51.00% 1675314.535
20 Executive Engineer, Narail O&M Division, BWDB, Narail Temporary Protective work on the right bank of Naboganga River from km 64.093 to km 64.111 = 0.018 km, km 64.123 to km 64.155 = 0.032 km Total 0.050  at Chandarchar upazila-Kalia, Dist-Narail  under Narail O&M Division, BWDB ,Narail during 2016-2017. 10.12.2017 2099226.300 51.00% 1070605.413
21 Executive Engineer, Narail O&M Division, BWDB, Narail Temporary Protective work on the right bank of Naboganga River from km 64.197 to km 64.317 = 0.120 km at Chandarchar upazila-Kalia, Dist-Narail  under Narail O&M Division, BWDB ,Narail during 2016-2017. 06.12.2017 4961770.880 51.00% 2530503.149
22 Executive Engineer, Khulna O&M Division-2, BWDB, Khulna Repair of embankment from km 13.600  to km 13.650  at Bigordana in Polder No. 22 under  Blue Gold Programme under Khulna O&M Division-2, BWDB, Khulna during 2016-2017 & 2017-2018, Tender ID 109249. 18.12.2017 1991698.000 100.00% 1991698.000
23 Executive Engineer, Khulna O&M Division-2, BWDB, Khulna Reexcavation of Changkusulia Khal from km 0.000  to km 1.730   in Polder No. 3 (Part) under  Blue Gold Programme under Khulna O&M Division-2, BWDB, Khulna during 2016-2017 & 2017-2018, Tender ID 100274 15.03.2018 2455413.000 100.00% 2455413.000
24 Executive Engineer, Satkhira O&M Division-2, BWDB, Satkhira Construction of Ring Dyke with Filling of Khal from km 28.050/0.00 to km 28.200/0.217=217m  in Polder No 7/2 at Kayergati in upazila Ashashuni, Dist-Satkhira under NDR budget during FY 2016-2017. 28.12.2017 1136308.000 100.00% 1136308.000
25 Executive Engineer, Rajshahi O&M Division, BWDB, Rajshahi Bank Protection work on the left bank of river Padma at Sonaikandi from km 1.350 to km 1.900 = 550 m under Rajshahi O&M Division, BWDB, Rajshahi during FY 2016-2017. Tender 27.06.2019 224101931.000 30.00% 67230579.300
26 Executive Engineer,  Manikganj W.D. Division, BWDB, Manikganj Precautionary Protective work along the left bank of Kaliganga River from km 0.000to km 0.165= 0.165 km  at Taraghat to protect Ramjan Ali High School at Upazila-Ghior, Dist-Manikganj under Manikganj WD Division, BWDB Manikganj during FY 2018-2019. 25.06.2019 1346892.000 100.00% 1346892.000
27 Executive Engineer,  Manikganj W.D. Division, BWDB, Manikganj Construction of Retired embankment along the left bank of Jamuna River from km 9.300 to km 9.650 = 350 m   in upazila-Doulatpur, Dist-Manikganj under Manikganj WD Division, BWDB Manikganj during year 2018-2019. 10.02.2018 1796622.911 100.00% 1796622.911
28 Executive Engineer,Khulna O&M Division-1, BWDB, Khulna Construction of Retired embankment  from km 10.880 to km10.910= 30 m   in Polder 30 under Khulna O&M Division-2, BWDB, Khulna under Blue Gold Programme during the  year 2018-2019 & 2019-20. 30.06.2019 2968500.000 100.00% 2968500.000
29 Executive Engineer,Khulna O&M Division-1, BWDB, Khulna Precautionary Repair of Embankment from km 26.486 to km 26.530 = 44m at Baroaria in c/w Blue Gold Programme under Khulna O&M Division, BWDB, Khulna during the year 2017-18 & 2018-19 30.09.2018 2288017.350 100.00% 2288017.350
30 Executive Engineer,Khulna O&M Division-1, BWDB, Khulna Precautionary Repair of Embankment from km 26.445 to km 26.485 = 40 m at in Polder No. 29 at Baroaria in c/w Blue Gold Programme under Khulna O&M Division, BWDB, Khulna during the year 2017-18 & 2018-19 30.09.2018 2079640.020 100.00% 2079640.020
31 Executive Engineer, Sirajganj O&M Division, BWDB, Sirajganj Construction of Bank Revetment work on the right bank of Jamuna River at Khudbandi, Shingrabari and Shuvogacha area in upazila-Kazipur, Dist-Sirajganj during FY 2017-18 & 2018-19. (BRE km 151.300 to km 151.700= 400m). 31.03.2019 197679407.060 33.00% 65234204.330
32 Executive Engineer, Gopalganj O&M Division, BWDB, RajshahiGopalganj Tungipara Helipad Area Decorative Gardening in Upazila-Kotalipara, Dist-Gopalganj under Gopalganj O&M Division, BWDB, Gopalganj, Tender ID 463384 30.06.2020 896859.000 100.00% 896859.000
33 Executive Engineer,  Manikganj W.D. Division, BWDB, Manikganj Construction of Embankment from km 9.650 to km 9.800=150m of Aricha-Jionpur Flood Control Embankment under Manikganj WD Division, BWDB, Manikganj. TID 399408 28.06.2020 823033.000 100.00% 823033.000
34 Executive Engineer,  Manikganj W.D. Division, BWDB, Manikganj 3D Gold Palated SS Letters in front of Tungipara Helipad under Gopalganj O&M Division, BWDB, Gopalganj, TID 463383 30.06.2020 314266.000 100.00% 314266.000
35 Executive Engineer, Gopalganj O&M Division, BWDB, RajshahiGopalganj Temporary Protective work from km 3.330 to km 3.433=133 m to protect College of Aricha-Jionpur Flood Control Embankment under Manikganj WD Division, BWDB, Manikganj. TID 127943 25.06.2020 7810448.000 100.00% 7810448.000
36 Executive Engineer,  Manikganj W.D. Division, BWDB, Manikganj Emergency supply of geobags for emergency protective work under Manikganj WD Division, BWDB, Manikganj. TID 458155 24.06.2020 3022220.000 100.00% 3022220.000
37 Executive Engineer, Lalmonirhat O&M Division, BWDB, Lalmonirhat Bank Revetment work along the right bank of Giridhary River from km 0.260 to km 0.600=340m in Upazila Aditmary, District Lalmonirhat under Lalmonirhat O&M Division, BWDB, Lalmonirhat 25.06.2020 47375000.000 100.00% 47375000.000
38 Executive Engineer, Lalmonirhat O&M Division, BWDB, Lalmonirhat Repair & Rehabilitation of Chandimary Spur at km 18.890 of Teesta River in UP Mohiskhola, Upazila-Aditmary, Lalmonirhat during 2019-2020 under  Lalmonirhat O&M Division, BWDB, Lalmonirhat 25.06.2020 8910000.000 100.00% 8910000.000
39 Executive Engineer Khulna O&M Div-2, BWDB, Khulna Precautionary protective work along the L/B of Bhadra river from km. 29.600 to krn. 29.633 total 0.033krn. at l.axnrikhola Ylazar in Polder No. 31 wtder Non-Development Revenue Budget during theyear 2A19-7020. 25.06.2020 2810172.000 100.00% 2810172.000
40 Executive Engineer Khulna O&M Div-2, BWDB, Khulna Precantionary protective work along the R/B of Clhurkuri river from km. 43.800 to krn. 43’833 total 0.033krn. at Courkathi rn Polder No. 31 under NouDevelopment Revenue Budget during the year 2019-7424. 25.06.2020 2315200.000 100.00% 2315200.000
41 Executive Engineer, Chittagong O&M Division-1, BWDB. Chittagong Construction of Drainage Sluice (l -vent: 1.50m. X 1.80m.) over Mahatammar Chara khal in Halim Khans Char of Char kanai Village at Habilash Dwip Union in Patiya Upazilla, Dist. Chittagong under NDR Budget during the year 2016-17,(e-GP-05/NDR/Sluice/2016-17) TID: 75346 29.03.2018 14289386.030 100.00% 14289386.030
42 Executive Engineer, Chittagong O&M Division-1, BWDB. Chittagong Bank Protection wot’k of Marginal-Dyke liom knr.29.016 to km.29.350: 334.00ni. at Sarenga of Raipur Union in Upazrlla Anowara, DistrictChittagong under Polder No-63/lA during the year’ 2011-18 (e-GP- .18tA DP/Sarensai llPW/201 7- I 8) “l-ender lD: I 5 l08ti 15.08.2019 72936335.173 100.00% 72936335.173
43 Executive Engineer, Sirajganj O&M Division, BWDB. Sirajganj Breach Closing and Embnakment resectioning work from m-4087 to m 4141 = 56m near Bahalbari, m 7982-m 8000= 18m near Ratonpur & m 24485-m 24565 =80m near Charbhangura under Sirajganj O&M Division, BWDB, Sirajganj during 2019-2020. 18.06.2020 1166078.732 100.00% 1166078.732
44 Executive Engineer, Sirajganj O&M Division, BWDB. Sirajganj Repair & Maintenance of houses and Construction of Shed in BWDB Colony & Newly Constructed Rest House under Sirajganj O&M Division, BWDB, Sirajganj during 2019-2020. 28.06.2020 1093862.085 100.00% 1093862.085
45 Executive Engineer, Sirajganj O&M Division, BWDB. Sirajganj Ditch and Pond Filling Work along C/S and R/S of Embankment to prevent the breach of BRE in Between km 138.460 to km 150.000  under Sirajganj O&M Division, BWDB, Sirajganj during 2019-2020. 28.06.2020 4043705.252 100.00% 4043705.252
46 Executive Engineer, Satkhira O&M Division-1, BWDB, Satkhira Temporary Slope Protection Work at Gagramari in Polder No. 15 from km 10.500 to km 10.750 Total 0.250 km under Operation Budget at Satkhira O&M Division-1, BWDB, Satkhira during the year 2019-2020. (Package No. Sat-1/W-8/2019-2020), TID No-387788) 20.05.2020 3065764.000 100.00% 3065764.000
47 Executive Engineer, Satkhira O&M Division-1, BWDB, Satkhira Temporary Slope Protection Work at Gabura in Polder No. 15 from km 19.575 to km 19.824 Total 0.260 km under Operation Budget at Satkhira O&M Division-1, BWDB, Satkhira during the year 2019-2020. (Package No. Sat-1/W-6/2019-2020), TID No-387786) 20.05.2020 2416481.000 100.00% 2416481.000
48 Executive Engineer, Bagerrhat O&M Division-1, BWDB, Bagerhat Repair & Resectioning of Embankment in between km 14.000 to km 15.000 total 0.500 km in Najirpur Project in Sadar Upazila Dist Bagerhat under Bagerhat O&M Division BWDB Bagerhat during the year 2019-2020 31.05.2020 1619311.955 100.00% 1619311.955
49 Executive Engineer, Chittagong O&M Division-1, BWDB, Chittagong Construction of Ichamati-kodala Khal Closure from km 21.630 to km 21.685=55.00m under Polder No- 63/1B during the yaer 2017-18(e-GP-46/ADP/Ichamati/kodala/Closure/2017-18) 18.05.2019 13554376.400 100.00% 13554376.400
50 Executive Engineer, Gopalganj O&M Division-1, BWDB, Gopalganj Emergency Protective work Along The right Bank of Baigerkul River From km 25.495 to km 25.530=35.00M In Munshipara At Tungipara Upazila Under Gopalganj O&M Division,BWDB,Gopalganj under Non Development Revinue Budget(NDR),During the yaer 2018-19.DMP 14/2018-19 31.05.2019 2097000.000 100.00% 2097000.000
51 Executive Engineer, Gopalganj O&M Division-1, BWDB, Gopalganj Emergency Protective work Along The right Bank of Baigerkul River From km 25.449 to km 25.494=45.00M In Munshipara At Tungipara Upazila Under Gopalganj O&M Division,BWDB,Gopalganj.Under Non Development Revinue Budget(NDR),During the yaer 2018-19.DMP 13/2018-19 31.05.2019 2697000.000 100.00% 2697000.000
52 Executive Engineer, Khulna O&M Division-1, BWDB, Khulna Repair & protection of embankment from Km 10.880 to Km 10.950=70 m in Polder No 30 Under Khulna O&M Division-2,BWDB, Khulna under Blue Gold Program (BWDB,Component) during the year 2018-2019 & 2019-20. Package No-15/K-2/BGP/2018-19,Tender ID-322018 30.06.2019 2968500.000 100.00% 2968500.000
53 Executive Engineer, Khulna O&M Division-1, BWDB, Khulna Construction of Kadomtola Drainage Cum Flushing Sluice (1v-0.90m*1.20m) at km 8.545 in Polder No.26 at upazila Dumuria District Khulna in connection with Blue Gold Program under Khulna O&M Division-1 BWDB Khulna during the year 2018-19 & 2019-2020.Package No- 17/K-1/BGP/2018-19 & Tender ID No- 263616 30.05.2019 16992628.000 100.00% 16992628.000
54 Executive Engineer, Bagerhat O&M Division-1, BWDB, Bagerhat Construction of RCC River Name Plate at different Location of Bagerhat District under Bagerhat O&M Division under Non-Development Revenue NDR Budget During the year 2019-20.Package No- BAG/NDR/OTM/Package-11/2019-2020,Tender ID- 402435 31.03.2020 1236920.478 100.00% 1236920.478
55 Executive Engineer, Chittagong O&M Division-1, BWDB, Chittagong Height Raising work of Sea-Dyke from km 39.142 to km 40.229(1028m) and from km 40.629 to km 41.092 (463m) total=1550m at Gahira and Batighar in Raipur Union,Upazila-Anowara under polder no 63/1A in connection with “Rehabilitation of coastal polder no- 62(Patenga), 63/1A (Anowara), 63/1B(Anowara & Patiya) in Chittagong District in Patiya-Anowara,District-Chittagong during the year 2016-17(e-Gp-15/Embkt/63/1A/2016-17) 15.08.2019 18600000.000 100.00% 18600000.000
56 Executive Engineer, Joypurhat O&M Division-1, BWDB,  Joypurhat Re-Excavation of Tulshiganga River from Km. 5.000 to Km 15.000 = 10.00 km in C/W “Re-Excavation of Tulshiganga, Little Jamuna, Chiri & Harabari River of Joypurhat District” Project during the FY 2019-2020, e-GP Tender ID No. 425732, Package No: JOY-W-04/2019-2020. 10.01.2021 140036171.985 49.00% 48559000.000
57 Executive Engineer, Kurigram O&M Division-1, BWDB,  Kurigram Emergency precautionary protective work on the right bank of flood control embankment of Brahmaputra river from km 52.700 to km 53.200 500m anantopur area at upazila-Ulipur District kurigram during 2019-2020 31.12.2020 37979209.840 100.00% 37979209.840
58 Executive Engineer, Chittagong O&M Division-1, BWDB, Chittagong Supplying HP Toner,EPSON Ink,2518A Toner,NPG51 Toner for Chittagong BWDB Office during the FY 2020-2021,Chittagong O&M Division-1 03.05.2021 24295.000 100.00% 24295.000
59 Executive Engineer, Chittagong O&M Division-1, BWDB, Chittagong Supplying HP Toner,EPSON Ink  for Chittagong BWDB Office during the FY 2020-2021,Chittagong O&M Division-1 03.05.2021 24295.000 100.00% 24295.000
60 Executive Engineer, Chittagong O&M Division-1, BWDB, Chittagong Supplying Level Book(LB) for Chittagong BWDB Office during the FY 2020-2021,Chittagong O&M Division-1 20.05.2021 24725.000 100.00% 24725.000
61 Executive Engineer, Faridpur O&M Division-1, BWDB, Faridpur Re-excavation of Naldanga Khal from KM 0.00 to KM 4.372=4.372 KM in C/W Re-excavation of small River Khal and Water Bodies in 64 District Phase-1 in Upazila Boalmari,District Faridpur under Faridpur O&M Division,BWDB,Faridpur,during the FY 2019-2020.TID 389114 30.05.2021 2041459.810 100.00% 2041459.810
62 Executive Engineer, Manikganj O&M Division-1, BWDB, Manikganj Supplying of 100% Polyster geo-textile bags (empty) for emergency works under Manikganj WD Division, BWDB, Manikganj during the financial year 2020-21. 28.06.2021 3050014.109 100.00% 3050014.109
63 Executive Engineer, Manikganj O&M Division-1, BWDB, Manikganj Precautionary Protective work along the Right Bank of Kaligonga River to Protect Ghusta Bazar and its adjacent area from km.25.250 to km.25.400= 150 m and km.25.700 to km.25.900= 200 m Total= 350.00 m in Upazila:- Manikganj Sadar, District:-Manikganj under Manikganj WD Division, BWDB, Manikganj during the year 2020-21. 31.08.2021 16418000.00 100.00% 16418000.000
64 Executive Engineer, Joypurhat O&M Division-1, BWDB,  Joypurhat Re-Excavation of Little Jamuna River From Km. 11.750 to Km. 23.300 Total 11.550 Km. in Connection With Re-Excavation of Tulshiganga Little Jamuna Chiri & Harabati River of Joypurhat District Project during the FY 2020-2021. 04.06.2021 162753563.03 49.00% 40082000.000
65 Executive Engineer, Rangpur O&M Division-1, BWDB,  Rangpur Protective work on the Right Bank of the River Ghagot from Km. 0.000 to Km. 0.400400m at Garalchaki in Upazila Mithapukur Dist. Rangpur Under Rangpur O&M DivisionBWDBRangpur 28.06.2021 43376697.043 100.00% 43376697.043
66 Executive Engineer, Shariatpur O&M Division-1, BWDB,  Shariatpur River Bank Protection Work along the left Bank of Padma River from Km 1.015 to Km 1.230 0.215 Km at Char Atra in Upazilla Naria of Shariatpur District under Shariatpur O&M Division BWDB Shariatpur during the year 2019-2020 & 2020-21 02.09.2021 136657234.978 100.00% 136657234.978
67 Executive Engineer, Kurigram O&M Division-1, BWDB,  Kurigram Bank Revetment Work on the Right Bank of Brahmaputra River from KM 56.800 to KM 57.300500m at Fakirerhat Area in Union Ranigonj Upazila Chilmari District Kurigram during 2019-2020 & 2020-2021. 16.11.2021 314782378.560 49.00% 117951024.240
68 Executive Engineer, Satkhira O&M Division-1, BWDB,  Satkhira Re-excavation of Pashmamunda khal From km-0.000 to km-3.500 total 3.500 km at Shyamnagar upazilla in Satkhira District under Small River/ Khal/Pond re-excavation project in 64 district 1st phase during the year 2020-21. 20.06.2021 6298534.725 100.00% 6298534.725
69 Executive Engineer, Manikganj WD Division, BWDB, Manikganj Precautionary protective work along the Left bank of Jamuna River from km.1.500 to km. 2.150 = 650 m at Bachamara in C/W River Bank Protection Works at Bachamara, Bahadurpur and Dhulsura area to Protect from River Bank Erosion at Manikganj District under Mankiganj WD Division, BWDB, Manikganj during the FY- 2021-22 & 2022-23.TID 606521,Package No. M-W-01/2021-22 30.03.2022 70313199.147 51.00% 35859731.565
70 Executive Engineer, Faridpur O&M  Division, BWDB, Faridpur Protective Work along the Right Bank of Arial Khan River from KM 0.300 to KM 0.600 = 300.00 M at Chandrapara in C/W “Bank Protective Work & Dredging Project in Arial Khan River in Faridpur District” in Upzallia- Sadarpur, District- Faridpur.TID 596124 26.06.2022 88256753.140 49% 43245809.039
71 Executive Engineer, Faridpur O&M  Division, BWDB, Faridpur Protective Work along the Right Bank of Arial Khan River from KM 0.600 to KM 0.900 = 300.00 M at Chandrapara in C/W “Bank Protective Work & Dredging Project in Arial Khan River in Faridpur District” in Upzallia- Sadarpur, District- Faridpur.TID 596125 26.06.2022 83567413.810 49% 40948032.767
72 Executive Engineer, Faridpur O&M  Division, BWDB, Faridpur Protective Work along the Right Bank of Arial Khan River from KM 0.900 to KM 1.200 = 300.00 M (With D/S Entermination) at Chandrapara in C/W “Bank Protective Work & Dredging Project in Arial Khan River in Faridpur District” in Upzallia- Sadarpur, District- Faridpur.TID 596126 30.06.2022 112840509.180 49% 55291849.498
73 Executive Engineer, Faridpur O&M  Division, BWDB, Faridpur Protective Work along the Right Bank of Arial Khan River from KM 0.600 to KM 0.815 = 215.00m at Duair Darga Bazar in C/W “Bank Protective Work & Dredging Project in Arial Khan River in Faridpur District” in Upazilla: Bhanga, District: Faridpur 2020-21. TID 596127 25.06.2022 40720073.780 100% 40720073.780
74 Executive Engineer, Faridpur O&M  Division, BWDB, Faridpur Protective Work along the Right Bank of Arial Khan River from KM 0.815 to KM 1.200 = 385.00 m (with D/S End termination) at Duair Darga Bazar in C/W “Bank Protective Work & Dredging Project in Arial Khan River in Faridpur District” in Upazilla: Bhanga, District: Faridpur 2020-21.TID 596128 30.06.2022 96881550.640 49% 47471959.814
75 Executive Engineer, Chittagong O&M Division-1, BWDB, Chittagong Height Raising work of Sea-Dyke from Km. 36.142 to Km. 40.229(1087m) and from Km. 40.629 to Km. 41.092(463m) totoal=1550m at Gahira and Batighar in Raipur Union,Upazila-Anowara under Polder No. 63/1A in connection with “Rehabili8tation of Coastal Polder No. 62(Patenga),63/1A (Anowara & Patiya) in Chittagong District” in Patiya-Anowara,District chittagong during the year 2016-17(e-GP-15/Embkt/63/1A/2016-17) 15.08.2019 31817174.610 100% 31817174.610
76 Executive Engineer, Satkhira O&M Division-2, BWDB,  Satkhira Emergency temporary repair of Embankment with slope protection work from Km. 24.230 to Km. 24.710=480.00 meter at purba Jhapa in polder No. 7/1 at Padmapukur Union,Upazila-Shyamnagar,Dist Satkhira under Satkhira O&M Division-2,BWDB,Satkhira in the FY 2021-22,Package No. DPM-YAAS-23/2021-22 24.07.2021 1485000.000 100% 1485000.000
77 Executive Engineer, Satkhira O&M Division-2, BWDB,  Satkhira Resectioning work of embankment along-with precautionary slope protection work by geo bag from Km. 23.630 to Km. 24.100 equal 470 meter in Polder No. 7/1 along the L/B of Kholpetua River at Kamalkathi Union-Padmapukur Upazila-Shyamnagar District- Satkhira under Satkhira O&M Division-2 BWDB Satkhira. 30.06.2021 7358500.000 100% 7358500.000
78 Executive Engineer, Sirajgabj O&M Division-2, BWDB,  Sirajganj Temporary Emergency protection work at Cross bar-3 Dredging of River syatem in Bangladesh(CDRSB) in Sirajganj Sadar Upazila District-Sirajgabj Under Sirajganj O&M Division,BWDB,Sirajganj during the yaer 2019-20. 28.10.2019 230000.000 100% 230000.000
79 Executive Engineer, Satkhira O&M Division-2, BWDB,  Satkhira Emergency Construction of 25.00 meter Breach
Closing & Approach Embankment with slope
protection work from Km. 24.770 to Km. 24.915 =145
meter at Dahkhin Jhapa in polder No. 7/l at
Padmapukur Union, Upazilta- Shyamnagar, Dist.
Satkhira under Satkhira O&M Division-2, BWDB,
Satkhira in the FY 2021-22. Package No. DPMY AAS-24n02b2022
24.07.2021 1019000.000 100% 1019000.000
80 Executive Engineer, Satkhira O&M Division-2, BWDB,  Satkhira Emergency Construction of 40.00 meter Breach Closing & Approach Embankment with Slope protection work from Km. 25.065 to Km. 25.230=165 meter at Dahkhin jhapa in polder No. 7/1 at Padmapukur Union,Upazila Shyamnagar,Dist Satkhira under Satkhira O&M Division-2,BWDB,Satkhira in the FY 2021-22,Package No. DPM-YAAS-25/2021-22 24.07.2021 1314000.000 100% 1314000.000
81 Executive Engineer, Faridpur O&M  Division, BWDB, Faridpur Protective Work along the Right Bank of Padma River from KM 17.420 to KM 17.650 = 230.00 M at Fazil Kha Dangi & Balia Dangi in C/W ” Bank Protective work & Dredging Project along The Right Bank of Padma River” in Upzallia- Charbhadrasion, District- Faridpur Under Faridpur O & M Division, BWDB, Faridpur During the FY 2021-22 (Package No-PADMA-13/PW/FBD/2021-22), PADMA-13/PW/FBD/2021-22,TID 626572 25.05.2023 93780359.247 100% 93564364.990
82 Executive Engineer, Faridpur O&M  Division, BWDB, Faridpur KUMAR/DREG-01/02/2021-22 Remaining Portion of Dredging work of Kumar River from Ch. km 16.477 to km 26.877 = 10.40 KM  Re-excavation of Kumar River Project under Faridpur O & M Division, BWDB, Faridpur during the FY 2021-22 (Part-2), KUMAR/DREG-01/02/2021-22,TID 689753 14.01.2023 19474721.693 100% 19447994.830
83 Executive Engineer, Faridpur O&M  Division, BWDB, Faridpur Remaining Portion of Dredging work of Kumar River from Ch. km 26.877 to km 27.577 = 0.700 KM  Re-excavation of Kumar River Project under Faridpur O&M Division, BWDB, Faridpur during the FY 2021-22. (Part-01), KUMAR/DREG-03/01/2021-22.TID 690656 15.01.2023 14796364.221 100% 14375300.710
84 Executive Engineer, Faridpur O&M  Division, BWDB, Faridpur Remaining Portion of Dredging work of Kumar River from Ch. km 26.877 to km 27.577 = 0.700 KM  Re-excavation of Kumar River Project under Faridpur O&M Division, BWDB, Faridpur during the FY 2021-22. (Part-02) KUMAR/DREG-03/02/2021-22.TID 690776 15.01.2023 15743555.968 100% 15352652.260
85 Executive Engineer, Faridpur O&M  Division, BWDB, Faridpur Protective Work along the Right Bank of Padma River from KM 17.190 to KM 17.420 = 230.00 M at Fazil Kha Dangi & Balia Dangi in C/W ” Bank Protective work & Dredging Project along The Right Bank of Padma River” in Upzallia- Charbhadrasion, District- Faridpur Under Faridpur O & M Division, BWDB, Faridpur During the FY 2021-22 (Package No-PADMA-12/PW/FBD/2021-22)  PADMA-12/PW/FBD/2021-22, TID 626559 02.03.2023 95034251.630 80% 76027401.304
86 Executive Engineer, Faridpur O&M  Division, BWDB, Faridpur Protective Work along the Right Bank of Padma River from KM 17.650 to KM 17.880 = 230.00 M at Fazil Kha Dangi & Balia Dangi in C/W ” Bank Protective work & Dredging Project along The Right Bank of Padma River” in Upzallia- Charbhadrasion, District- Faridpur Under Faridpur O & M Division, BWDB, Faridpur During the FY 2021-22 (Package No-PADMA-14/PW/FBD/2021-22), PADMA-14/PW/FBD/2021-22,TID 626590 25.05.2023 115203403.170 80% 92162722.536
87 Executive Engineer, Rajbari O&M  Division, BWDB, Rajbari Rehabilitation of protective work along the R/B of padma river From km. 54.600 to km 54.747 = 147m in c/w “Rajbari Town Protection (Phase-II )(1st Revised)” at Location: Godarbazar, Union: Mijanpur, Upazilla: Rajbari Sadar , Dist. Rajbari under Rajbari O&M Division, BWDB, Rajbari during the FY 2021-22. TID 644381,Package No.RW-RAJ-05 30.06.2022 103149825.214 49% 48016711.073
88 Executive Engineer, Rajbari O&M  Division, BWDB, Rajbari Rehabilitation of protective work along the R/B of padma river from km 55.016 to km 55.169=153 m in c/w “Rajbari Town Protection (Phase-II )(1st Revised)” at Location: Godarbazar, Union: Mijanpur, Upazilla: Rajbari Sadar , Dist. Rajbari under Rajbari O&M Division, BWDB, Rajbari during the FY 2021-22.TID 644390,Package No.RW-RAJ-07 30.06.2022 100336346.064 49% 46198987.126
89 Executive Engineer, Natore O&M Division, BWDB,  Natore River bank protection work on the right bank of Barnai river from Km. 28.500 to Km. 28.800 300 m. at Punduri Upazila- Singra District- Natore under Natore O&M Division BWDB Natore during the year 2020-21.TID 529152 18.01.2023 28600000.000 100% 23078140.000
90 Executive Engineer, Gopalganj O&M  Division, BWDB, Gopalganj River Bank Protective work along the right bank of MBR channel from km. 0.000 to km. 0.400 = 400m at Dumdia, Union-Urfi in Upazilla-Gopalganj Sadar, District-Gopalganj under Gopalganj O&M Division, BWDB, Gopalganj in C/W “West Gopalganj Integrated Water Management Project (2nd Phase)” during the year 2021-2022.TID 640282,Package No. WG/WMP-II MM-PW-07 30.06.2023 92657640.232 49% 45402243.714
91 Executive Engineer, Gopalganj O&M  Division, BWDB, Gopalganj River Bank Protective Work along the Left Bank of Madhumati River from km 0.000 to km 0.250 = 250m at Dubshi Mollapara, Upazil-Gopalganj Sadar, Dist: Gopalganj under Gopalganj O&M Division, BWDB Gopalganj in C/W ‘West Gopalganj Integrated Water Management Project (Phase-II)’ during the year 2021-2022. TID 640283,Package No.  WGIWMP-II_MBR_PW-03. 30.06.2023 70631235.518 49% 34609305.404
92 Executive Engineer, Gopalganj O&M  Division, BWDB, Gopalganj River Bank Protective Work along the Left Bank of Modhumoti River from km. 0.000 to km. 0.250 = 250.00m at Char Dolaitola, in Upazilla- Gopalganj Sadar, Dist : Gopalganj Under Gopalganj O&M Division, BWDB Gopalganj in connection with “West Gopalganj Integrated Water Management Project (Phase-II)” During the year 2021-2022.TID 638966,Package no.  WGIWMP-II_MM_PW-02 30.06.2023 74200503.415 100% 74200503.415
93 Executive Engineer, Rangpur O&M  Division, BWDB, Rangpur Protective/ Kor-12
420 m River Bank Protection work along the Left bank of Korotoya river at Sulalondhapur in UZ. Pirgonj, Dist. Rangpur under Rangpur O&M Division, BWDB, Rangpur. TID 651808
30.06.2023 67002976.258 100% 66985674.000
94 Executive Engineer, Rangpur O&M  Division, BWDB, Rangpur Protective/ Kor-13
500m River Bank Protection work along the Left bank of Korotoya river at Chak veka in UZ. Pirgonj, Dist. Rangpur under Rangpur O&M Division, BWDB, Rangpur.TID 651809
30.06.2023 69052983.797 100% 58913241.000
95 Executive Engineer, Bogura O&M  Division, BWDB, Bogura Bank Protection work of Length 0.900 km along the Right bank of Bangali river at Binodpur & Shahebbari in Sherpur Upazila of Bogura District in c/w Dredging/Re-excavation of Bangali-Karotoa-Fuljor-Hurasagor River System with Bank Protection Project under Bogura O&M Division BWDB Bogura during the FY 2019-2020 to 2021-2022.TID 435231,Package No.  PWB-17/LOT-02 29.12.2022 177850000.000 70% 124495000.000
             
EED,Rangpur :

 

 
Sl No. Procuring Entity Details Name of works DATE OF COMPLETION Value of Works Share of
Tenderer
Tenderer Owned Actual Value of Works
96 Executive Engineer, EED, Lalmonirhat Construction of 05 storied Academic cum Workshop Building with 05 storied foundation in/c. Sanitary & Water supply, Electrification, Generator & Deep Tube Well Works at Lalmonirhat Technical School & College, Sadar, Lalmonirhat,TID: 403951,Package No. XEN/EED/KZ/64TSC/Lalmonirhat TSC/19-20/02 25.10.2023 70215832.000 49.00% 34405757.680
Bangladesh Coast Guard:

 

 
Sl No. Procuring Entity Details Name of works DATE OF COMPLETION Value of Works Share of
Tenderer
Tenderer Owned Actual Value of Works
97 Assistant Director,Bangladesh Coast Guard Ccutstruction of Boundary wall and Barbed wire felrcing at BCG Station Sudurchar 20.06.2023 27803605.800 100.00% 27803605.800